Record Details
Field | Value |
---|---|
Title | page 473 |
Relation | 1413 |
Date | 2004-12-15 to 2004-12-29 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Type | page |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 224.133 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description | Bar, and a channel 3,200 feet long, carrying 15 feet of water at the lowest stage of the river, was completed (hiring this year. This year it is expected to nearly complete Swan Island Bar, excavated to 18 feet of water, at an estimated cost of $31,200. A channel at the mouth of the river was also excavated 841 feet long by 100 feet wide by 4 feet in depth. There yet remains to be dredged at this place about 200 linear feet, which will be completed this year, at an estimated cost of Total... |
Identifier | http://oregondigital.org/u?/wwdl,1121 |