Record Details
Field | Value |
---|---|
Title | page 3223 |
Relation | Report of the Chief of Engineers 1899 Part 4 |
Rights | This item is in the public domain. Acknowledgement of the University of Oregon Libraries as a source is requested. |
Format | Scanned from originals using Silverfast AI 6.0 on UMAX Powerlook III flatbed scanner. Scanned images saved as 16 bit grayscale tiffs. 295.376 kb 8 bit - Gray Gamma 2.2 - greyscale Omnipage 14 used to OCR 8 bit grayscale tiffs and generate text files for full text access. 16 bit grayscale tiffs edited in Photoshop 6.0: cropped, rotated, reduced in size, levels adjusted, bit depth reduced to 8 and JPEGs created. |
Description | The following additional provisions of the present modified project are printed on pages 3579-3582 of the annual report for 1895, Part V : 5. To cover the floor of the canal wherever necessary with concrete 8 inches thick, both above and below the locks. 6. To construct two iron stairways between the upper and lower levels on the land side of the canal and iron steps in culvert valve walls. 7. To construct and place a temporary movable data on each of the masonry piers supporting the... |
Identifier | http://oregondigital.org/u?/wwdl,542 |