Results

176 - 200 of 12321 Items    << < 3 4 5 6 7 8 9 10 11 12 > >> 
Thumbnail
Title
Description
Dates
By Lorraine E. Flint, Alan L. Flint, Debra S. Curry, Stewart A. Rounds, and Micelis C. Doyle Abstract The U.S. Geological Survey (USGS) collected water? quality data during 2002 and 2003 In the Lower Klamath River Basin, in northern...
2024-04-18
2006-10-13
2005-07-07
A problem confronting the Corps of Engineers and other water resources planners in the Pacific Northwest is the prediction of anadromous fish enhancement benefits that would result from a proposed high dam project. These benefits are expected from...
1974-07-22 (iso8601)
This scene is typical of most of the Grand Coulee Dam Reservoir. Previous to the formation of Lake Mead by Boulder Dam the Gatum Reservoir in Panama was the largest man-made reservoir, having a capacity of 4,413,000 acre feet of storage. Fort...
2024-04-18
Two Oregon reservoirs contaminated by different mercury sources were compared for mercury distribution in sediment and bioaccumulation by fish. The average mercury concentration in the sediment of Cottage Grove reservoir (0.67 ± 0.05 μg/g dry wt)...
1996-03-07 (iso8601)
2005-10-13
An established economic simulation model for reservoir development was applied to ten reservoir projects throughout Texas. The model as a predictor of economic impact was given a difficult test because of the diversity of geographic, economic, and...
2011-06-30
2011-06-30
1969-08-01
have an annual output of 940,000,000 kilowatt-hours. The reservoir behind Bliss Dam would flood out some of the existing power installations noted previously in connection with the upper Snake Basin. Replacement of the firm power output so...

Correspondence, business records, drawings, maps, and photographs of the corporate firms which established Clarkston; Organizational History:; The Lewiston-Clarkston Improvement Company (LCIC), the third and best-known corporate name of one of the...

"Reprinted May 2003."; Includes bibliographical references; Also available at http://eesc.oregonstate.edu/agcomwebfile/edmat/html/sr/sr1037/sr1037.html
2024-04-18
2004-10-22
2004-08-24
TRINITY RIVER FLOW EVALUATION - FINAL REPORT EXECUTIVE SUMMARY When Congress authorized construction of the Trinity River Division (TRD) of the Central Valley Project (CVP) in 1955, the expectation was that surplus water could be exported to the...
1999-04-18
2006-11-30
2005-03-17
2005-10-14
2005-10-13
176 - 200 of 12321 Items    << < 3 4 5 6 7 8 9 10 11 12 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press