South end of Government Camp in foreground. East abutment excavation across the river.
1934-12-02
2024-11-22 |
Illustrations of incidents that resulted in close calls for employees.
1950-06-23
2024-11-22 |
Here operations are just starting at the site of the combination vehicle and railroad bridge across the Columbia about a mile downstream from the dam.
2024-11-22
|
An aerial view of the feeder canal looking west. The surface runoff chutes on the right slope of the canal in the foreground area are at stations 45+05 and 48+60, respectively. The slide cracks are visible at the left center. A good view of the...
1947-10-21
|
South Coulee Dam--Main Canal Headowrks--View taken from the east bank of the approach channel looking west and downstream. Mixer and ""Pumperete"" set-up are shown in the central part of the view. The cut-off wall footing which runs through the...
1948-05-04
|
Floating Caisson aft section passing thru the drydock gates as it moves out into the drydock channel, where it will be moored while the Caisson Seat Frame is being assembled in the drydock. Foreground, Caisson with operating machinery on deck....
1949-08-24
|
Dismantling of the westmix concrete plant used by the MWAK Co. Consolidated Builders re-assembled it in a new location on the east side of the river.
1938-04-05
2024-11-22 |
Shift change--M.W.A.K. employees crossing wide crevice in foundation.
2024-11-22
2024-11-22 |
Timber cribs being placed in downstream cross-river cofferdam - sheet pile lining between cribs and berm shown in lower right. Aggregate suspension bridge in upper part running to west mixer.
1936-12-07
2024-11-22 |
Spider on west end of dam enroute to right powerhouse. The dimensions of the spider are: Length; 27'-7"" Width; 16'-4"" Depth; 6'-1""
1948-07-22
|
Early winter scene of steam cranes on barges placing cross-river cofferdam and removing west cofferdam.
1936-12-02
2024-11-22 |
In the distance is shown dust clouds arising from gravel pit stripping operations. Northeast corner of Mason City is in the foreground.
1935-05-27
2024-11-22 |
North Coulee Dam, Piezometer Terminal Well, A view of the piezometer test apparatus at the corner of the upstream and right walls of the well. The pore pressure in the dam embankment and foundation are transmitted through the water-filled tubes...
1950-10-24
|
Preparing surface of concrete for next pour by washing with air and water. One-inch cooling pipe on top of lift pour.
2024-11-22
2024-11-22 |
Placement of last crib in downstream cross-river coffer. Overhead is aggregate suspension bridge. Left center is east end of 1024 el. placing trestle.
1936-12-02
2024-11-22 |
Contractor's catwalk, later replaced by one slightly farther downstream.
1935-01-30
2024-11-22 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Columbia River Dam Topography of Existing Ground Surface at Brett Gravel Pit at end of MWAK Co. contract
1938-04-08
2024-11-22 |
Corner of a timber crib for cross river cofferdam - 12 x 12 inch fir.
1936-05-01
2024-11-22 |
Speech about the potential for increasing hydroelectric power in the Colorado River Basin and throughout the U.S.
1976-12-13
2007-01-02 2007-01-02 |
Man works with concrete during construction of Grand Coulee
1940-07-26
|
Showing granite armor rock along the left riverbank below Grand Coulee Dam ready for placing in section ""A."" The rock is obtained from the upriver quarry. This work is performed by J.A. Terteling and Sons, Inc., under provisions of negotiated...
1949-04-26
|
Caterpillar hauls away materials during the excavation of Grand Coulee site.
2024-11-22
|