Exhaust blowers were used to ventilate the pumping plant discharge tunnels while excavation was in progress.
1939-01-09
2024-11-23 |
Foundation excavation nearing completion on the right abutment at the dam, above elevation 1024.
1938-05-26
2024-11-23 |
Album leaf 173: Downstream face of dam 10/37
PH Coll 238.173
2024-11-23
|
Center portion of Government Camp, looking down Douglas Avenue - Administration Building in the foreground
1935-06-28
2024-11-23 |
Rubble masonry retaining wall for the future parking area near the right abutment of the dam.
2024-12-23
2024-11-23 |
The two ends of west cofferdam removed and area west of block 40 flooded.
1936-11-20
2024-11-23 |
Government Camp across the river. Pier 3 for highway bridge under construction - top of pier 2 (east side) in foreground.
1935-04-25
2024-11-23 |
Contractor's employees receiving their "brass" in going on shift at west guard office.
1936-07-17
2024-11-23 |
Album leaf 125: Wooden fabrication on side of dam, 6/29/37<br><br>PH Coll 238.125
2024-11-23
|
Excavation for copper cable grounding mat on west tailrace slope
1935-11-08
2024-11-23 |
First 30 houses under construction in Government Camp.
1935-01-03
2024-11-23 |
Government Camp looking up Douglas Avenue toward Administration Building.
1935-03-29
2024-11-23 |
Storage of aggregate at mixer stock piles - capacity 90,000 tons, or a 3 1/2 day run at maximum concrete output.
1935-04-27
2024-11-23 |
Distance view of the future site of Grand Coulee Dam.
2024-11-23
|
"Excerpt from an address by Frank A. Banks, District Manager, Bureau of Reclamation to the Washington Public Utility District Commissioners' Association, Coulee Dam, Washington, May 26, 1945"
|
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: Five Room Residence Type 4 & 4A Floor Plans
1935-02-05
2024-11-23 |
Distance view of the future site of Grand Coulee Dam. Excavation operations may be seen in foreground.
2024-11-23
|
President Roosevelt, a visitor on October 2, 1937, being shown over the project by construction engineer, F. A. Banks.
1937-10-02
2024-11-23 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: Five Room Residence Type 4 & 4A Elevations
1935-02-05
2024-11-23 |
Label on verso: WORK PROJECTS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date 11/26/40; O.P. No. 65-2-93-146; Zone 1; County: Stevens; City; Neg. C-757; Title: Columbia Basin Clearing Project;
Caption: Workers return to Camp Ferry. Camp...
2024-11-23
|
Washington officials inspect Grand Coulee Dam. From left to right - Field Engineer, A. F. Darland; Office Engineer, J. H. Miner; Commissioner of Bureau of Reclamation, John C. Page; Secretary of the Interior, The Hon. H. L. Ickes; and Construction...
1938-10-25
2024-11-23 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: South Dormitory Floor Plans
1934-11-15
2024-11-23 |
Caption on verso: General view of clearing activities in reservoir area above dam. Everything is burned except merchantable timber 6 inches and larger in diameter. This is transported to sawmills and cut into lumber. Nov. 21, 1939. US WPA...
2024-11-23
|