Downstream openings of outlet tunnels at elevation 934, with temporary bulkheads.
2024-11-23
2024-11-23 |
General view, looking west from the east abutment. In the center foreground is the frozen arch dam. Excavation operations are in progress in the center section.
1937-02-18
2024-11-23 |
Here jackhammer crews are at work on the upper portals of the pumping plant tunnels. Excavation of rock in these discharge tunnels was bid by CBI at $10.00 per cubic yard. In the gravity plan for irrigating the Columbia Basin there was one place...
2024-11-23
|
CONTENTS STATEMENTS Page American Farm Bureau Federation 26963 Bell, Craig, Executive Director, Western States Water Council 26945 Domenici, Hon. Pete V., U.S. Senator From New Mexico 2691 Gaibler, Floyd, Deputy Undersecretary for Farm and...
2024-11-23
2005-02-16 2005-02-02 |
Erection in progress on a large Colby hammerhead crane, as well as on the elevation 1180 construction trestle. When completed, this crane will measure 356 feet from tip to tip of the boom, and will weigh 268 tons.
1938-07-25
2024-11-23 |
Acceptable bedrock in east abutment; high placing trestle; low trestle on extreme left.
1936-12-03
2024-11-23 |
These 22 foot diameter openings are the lower portals of the pumping plant tunnels which pass upward thru the cliff and daylight on the irregular hill side. The wedge shaped excavation to the right is the gantry crane recess before it was lined...
2024-11-23
|
This is a view looking west across the dam, showing the span of the great cantilever cranes. The last of the CBI cantilever cranes were dismantled on Sept. 12, 1940. Note the transverse beams inside the trestle towers on which monorail cranes...
2024-11-23
|
Temporary bulkhead gates in set of three draft tubes - west power house.
1936-11-01
2024-11-23 |
Concrete gate compartments and tunnels under balancing pile, Brett pit.
1935-07-17
2024-11-23 |
Here the pumping plant wing dam is almost completed. The level area in the foreground was once a high rock spur known as the "Dragon's Tooth". During the summer of 1945 a fault known to exist in the rock west of the pumping plant, and extending...
2024-11-23
|
Compressed air supplies the force to the power cylinder of these duplex piston displacement grout pumps, thus giving the operator a sensitive control over the grouting operation, as well as affording great simplicity and flexibility. Grouting of a...
2024-11-23
|
Downstream Face Forms - First Cantilever Section - Abutment Areas Figure I, Appendix II
1941-03-26
2024-11-23 |
Presention on the history and origin of the Columbia Basin Project presented at the annual meeting of the Washington Irrigation Institute in Pasco, WA 05-06 December 1940
2024-11-23 |
Concrete placing in progress in the lining of the left abutment gantry crane siding recess.
1939-09-06
2024-11-23 |
the Washington side. By passing up these ladders, the fish are able to get to the 70-foot high pool behind the dam, and to the spawning grounds beyond. Returning baby salmon, known as fingerlings, are helped downstream by means of five bypass...
|
Night view, looking northeast from upstream. High trestle over dam, and above it lighted aggregate suspension bridge conveyor running diagonally toward upper right corner. Lights across the river are in Mason City. Row of lights running to upper...
1936-10-01
2024-11-23 |
Building one of nine barges for work on river diversion and dam construction.
1936-08-01
2024-11-23 |
Governor Clarence D. Martin officially placing the first bucket of concrete in the dam.
1935-12-06
2024-11-23 |
Cascading Columbia River flood waters pour through the spillway diversion channels in waterfalls higher than Niagara.
1940-05-27
2024-11-23 |
Grouting plant for service to contraction joints, located under trestle in blocks 10 and 11.
1937-06-29
2024-11-23 |
A gate body casting for the elevation 934 outlet works is lowered into a blockout. The 102-inch ring seal gates will be installed.
2024-11-23
2024-11-23 |