Results

2001 - 2025 of 2123 Items    << < 76 77 78 79 80 81 82 83 84 85 > >> 
Thumbnail
Title
Description
Dates
Looking west, Government Camp across the river.
1934-12-01
2024-04-18
Document: "Public Power --Fact Sheet 18, 1961 Supplement," Aug. 31, 1961, page 1
1961-08-31
2006-09-18
View of cracked and bent terminal stud on top of Westinghouse 230-kv bushing serial No. 3 for 36,000-kva transformers purchased under specifications No. 1025
1947-07-30
Rotating wearing ring unit L-1 turbine runner showing erosion of ring near top and bottom
1946-06-26
Construction in progress on the Entiat hatchery on the Entiat River.
1940-09-19
2024-04-18
The Leavenworth migratory fish control station and surrounding lands. The prominent body of water is the Icicle Creek diversion canal which suppliers water to the holding ponds. To the right of the canal and partially obscured by trees are the...
1940-09-12
2024-04-18
Looking towards the upstream end of the Icicle River bypass or diversion canal, which will carry flood waters around the salmon holding ponds at the Leavenworth migratory fish control station
1939-12-22
2024-04-18
Existing location of the Great Northern Railroad and State Highway No. 22, paralleling the Columbia River above Bossburg, Washington. The railway at this point will be inundated, but the highway will not since it is at elevation 1310 or higher.
1938-06-03
2024-04-18
Western Pipe and Steel Company's fabrication plant at Electric City.
2024-04-18
2024-04-18
The temporary fish ladder provided at block 62 for the passage of migratory fish during the 1938 season.
1938-04-11
2024-04-18
Notwithstanding the quantity of ink that has been spilt over such questions, only a few things are clear. There was significant over-fishing and habitat disturbance in the Columbia River Basin long before the mainstem dams were built. Snake River...

Unlabeled Photo of the Columbia River
2024-04-18
Late in November, 1939 workers began constructing a 2,500 feet 5 ft. by 7 ft. unlined tunnel from Upper Snow Lake to the Nada lake for fish hatchery operations.
2024-04-18
The diversion canal at the Leavenworth hatchery station. Excess Icicle Creek water which cannot be passed through the holding ponds is bypassed through this canal.
1940-05-08
2024-04-18
The log house at the Leavenworth migratory fish control station which was converted into a dormitory for fish hatchery employees.
1939-08-16
2024-04-18
Page The Kittitas Canal, upper Yakima Valley, Wash 55 Old growth Douglas fir and hemlock in Willamette Valley, Oregon 58 Sawmill near Eugene, Oreg., across storage pond 58 Sunshine Mine near Kellogg, Idaho, largest single producer...

Notwithstanding the quantity of ink that has been spilt over such questions, only a few things are clear. There was significant over-fishing and habitat disturbance in the Columbia River Basin long before the mainstem dams were built. Snake River...

Mason City town site (contractor's camp); Government Camp in foreground
1935-10-01
2024-04-18
This is a view of one of the holding pools constructed along Icicle Creek, where the adult salmon are held until ripe for spawning. Salmon eggs hatch in about 2 1/2 months, depending on the water temperature, and the young remain in the hatching...
2024-04-18
:hw: [Aug, 31, 1961] :/hw: Page 12 Public Power--Fact Sheet 18 1961 SUPPLEMENT VIII. KENNEDY ADMINISTRATION SPURS COLORADO RIVER STORAGE PROJECT TRANSMISSION LINES A. Background The $1 billion Colorado River Storage Project (C.R.S.P.) was...
96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8"" diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17"" x 11"" while wedge side dimensions are 17"" x 10"" x3""
1944-03-20
Failure of L-3 Turbine. Note: deflector plate on top of runner and the one deflector plate that was left in original position. Also scored condition of runner top rib
1945-06-15
Concrete portion of the Wenatchee canal for supplying Wenatchee river water to the Leavenworth station.
1940-05-09
2024-04-18
Contractor Norris Bros. complete a section of the Icicle pipeline before winter arrives. This pipeline will supply Icicle River water to the hatchery and rearing ponds.
1939-12-21
2024-04-18
2001 - 2025 of 2123 Items    << < 76 77 78 79 80 81 82 83 84 85 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press