West Powerhouse from Car Skip
1940-04-10
Men working inside powerhouse
1939-01-20
Close up view of men working on eastern spillway arch.
1941-07-15
Concrete placing in twist slot
1941-10-15
Placing scroll case section L1 W. powerhouse
1941-08-21
Interior of caisson drydock showing rock that is being placed in bottom. Sand will be placed on top of rock and reinforced concrete atop the sand. The four piers form the resting place for the caisson
1944-11-29
View of men breaking up rock for excavation operations.
2024-04-25
View from of excavation taken from across the river. Structures visible in the foreground.
1934-04-02
Transformer deck at East Powerhouse
1941-12-29
Progress view of the stage of construction on the R-1 scroll case.
1948-08-17
View of the spillway section from the left bank
1941-03-31
Men work on drum gate number one
1940-12-07
Spillway Section--downstream face
1940-10-24
Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman.
1947-06-28
The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place.
1947-06-27
A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground
1942-11-28
96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8"" diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17"" x 11"" while wedge side dimensions are 17"" x 10"" x3""
1944-03-20
Failure of L-3 Turbine. Note: deflector plate on top of runner and the one deflector plate that was left in original position. Also scored condition of runner top rib
1945-06-15
Failure of L-3 Turbine. Note: deflector plates wedged between crown plate and runner looking east by south-east
1945-06-15
Repairs to L-3 packing box. Boring arm making second cut.
1942-11-25
View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond...
1949-11-18
First placement of granite armor rock at the downriver end of section ""A."" Note the size of the rock in comparison to the man; armor rock weighing over 10 tons has been placed. This rock is obtained from the upriver quarry under work performed...
1949-04-26
Painted surface of wicket gate--Turbine L-2. This view is representative of the painted surface on the outer face of the wicket gates and shows the alligatoring of the paint along the trailing edge.
1942-07-13