Results

76 - 100 of 182 Items    << < 1 2 3 4 5 6 7 8 > >> 
Thumbnail
Title
Description
Dates
View of the dam with newly constructed observation building in the foreground
1941-07-04
Specifications No. 2475, March, 23, 1949. This is picture No. 4 of a series of thirteen showing movements of the floating caisson on its initial trial run from the drydock to the spillway bucket. The caisson is at station A29+98.38/B5+97.92 at...
1949-03-23
A view of early excavation operations at Grand Coulee
2024-04-19
Scoring of the leading side of generator break piston #1 due to its tilting during jacking of the rotor. Top of piston is in lathe chuck--leather is removed from the bottom of piston. Unit L-1, Grand Coulee Power Plant
1946-10-16
Specification No. 2475, March 24, 1949. When this photograph was taken the floating caisson was anchored by its ""A"" frame to the spillway bucket section. The caisson barge with machinery for operating the caisson is between the towers. At the...
1949-03-24
Specifications No. 2475, March 24, 1949. This photograph was taken as the floating caisson was being submerged in the spillway bucket during its initial trial operation. The caisson barge with operating equipment is shown floating between the...
1949-03-24
View of eight thrust bearing discs for unit L-3. The discs are laying upside down to indicate worn spots in the centers where the jack screws had made contact. The depth of these holes varied from 0.005"" to 0.007"" Grand Coulee Power...
1945-10-22
Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia
1941-05-22
A 5-yard electric shovel, 10-yard dump buggy and 75 H.P. diesel Caterpillar used for excavating in the west side river diversion channel
1936-07-30
Progress photos of the East Powerhouse as of date.
1941-08-07
Bays 1-2 and 3 in East Powerhouse.
1942-02-23
Hoisting elevator shaft form into place. 3 men riding load.
1941-06-30
Aim crosshairs for aligning drum gates.
1941-03-06
Concrete breaker used to tighten bolts on L-6 scroll case
1943-05-26
A centrifugal oil purifier, a filter, and automatic electric heater, and meter, pumps, gauges, pipes, and necessary appurtenances are mounted on a simple truck for use in various parts of the plant. The unit is designed to handle lubricating,...
1941-09-10
Wicket gates for L-8 turbine resting on generator deck. Mr. H.R. Ramm, U.S.B.R. cleaning and inspecting shafts
1947-06-28
Men install piping during early phase of construction.
1936-11-09
View of East Powerhouse and transformer deck with outlet tubes in background.
1942-04-28
South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west...
1948-09-02
East spillway, showing elevator shaft.
1941-06-30
View of the spillway section from the left bank
1941-03-03
Transition form for inlet to 57-inch supply pipe for drum gate control. One of these water supply inlets is in each pier for a total of 11. A 57"" butterfly valve will be connected to this inlet for control of water supply.
1940-06-12
Needle valve being lowered to base in R-8 of East Powerhouse
1944-11-24
76 - 100 of 182 Items    << < 1 2 3 4 5 6 7 8 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press