Results

26 - 50 of 260 Items    << < 1 2 3 4 5 6 7 8 9 10 > >> 
Thumbnail
Title
Description
Dates
CN-12-201-342NA Klamath Project - Oregon-California. View of downstream area of Gerber Dam showing plunge pool excavation and riprap. Over-excavated area is at right of photo; December 19, 1973; Bureau of Reclamation photo by C. D. Lawrence
1973-12-19
2010-02-08
2007-03-27
CN-12-201-325NA Klamath Project - Oregon-California. "977" Loader and D-8 dozer moving material below Gerber Dam; November 26, 1973; Bureau of Reclamation photo by J. A. Renning
1973-11-26
2010-02-01
2007-03-27
P12-200-2847NA Gerber Dam, Klamath Project, Oregon=California. First team of divers, with standby diver and line tenders, preparing for examination of trashrack area. Note "downline" in center of picture to aid divers in returning to surface....
1966-02-15
2008-10-07
2006-05-02
CN-12-201-543NA Klamath Project. View from Dam crest of water flow over Gerber spillway from left side. Spill was 60 cfs.; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-12
2007-03-28
CN-12-201-332NA Klamath Project - Oregon-California. Plunge pool excavation below Gerber Dam. Note mucky condition of material; November 26, 1973; Bureau of Reclamation photo by J. A. Renning
1973-11-26
2010-02-03
2007-03-27
CN-12-201-535NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-06
2007-03-28
CN-12-201-408NA Klamath Project - Oregon-California. Footbridge at Gerber Dam; May 8, 1974; Bureau of Reclamation photo by J. A. Renning
1974-05-08
2010-03-09
2007-03-27
CN-12-201-345NA Klamath Project - Oregon-California. View looking downstream from Gerber Dam. "977" Loader is returning from riprap borrow area which is just around the bend. Note mucky condition of channel; December 19, 1973; Bureau of...
1973-12-19
2010-02-09
2007-03-27
CN-12-201-339NA Klamath Project - Oregon-California. View of area below Gerber Dam. Ripraping remains to be completed. Area in foreground is not to be riprapped; December 19, 1973; Bureau of Reclamation photo by C. D. Lawrence
1973-12-19
2010-02-04
2007-03-27
CN-12-201-331NA Klamath Project - Oregon-California. Scaffolding on face of Gerber Dam. Note concrete removed below scaffolding; November 26, 1973; Bureau of Reclamation photo by J.A. Renning
1973-11-26
2010-02-03
2007-03-27
P12-200-2845NA - Gerber Dam, Klamath Project, Oregon-California. Reservoir surface covered with 14 inches of ice. Overflow spillway crest in background. From left to right: B. H. Carter, J. L. Andrews, T. J. Spicher, G. W. Fuller, T. E. Morris;...
1966-02-15
2008-10-07
2006-05-02
CN-12-201-541NA Klamath Project. View from left abutment area of Gerber Dam, showing Safety Buoys in place; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-11
2007-03-28
CN-12-201-534NA Klamath Project. View of water flowing over spillway into plunge pool at base of Gerber Dam, from right side of plunge pool; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-06
2007-03-28
CN-12-201-330NA Klamath Project - Oregon-California. Plunge pool excavation, Gerber Dam. "977" Loader working on plunge pool excavation; November 26, 1973; Bureau of Reclamation photo by J. A. Renning
1973-11-26
2010-02-02
2007-03-27
P-12-200-3016NA Klamath Project - Oregon-California. Repair area on Gerber Dam showing dowels and snap ties. The snap ties are tied off to form wores from the initial construction. The dowels have been grouted in place with quick setting cement...
1974-04-14
2008-12-10
2006-05-16
CN-12-201-414NA Klamath Project - Oregon-California. Erection of footbridge at Gerber Dam; May 3, 1974; Bureau of Reclamation photo by Bill Cummings
1974-05-03
2010-03-15
2007-03-27
CN-12-201-337NA Klamath Project - Oregon-California. Plunge pool excavation, Gerber Dam. Over-excavated area may be seen in center of photo. Gates are exposed to right; December 19, 1973; Bureau of Reclamation photo by C. D. Lawrence
1973-12-19
2010-02-04
2007-03-27
CN-12-201-329NA Klamath Project - Oregon-California. D-8 dozer moving material below Gerber Dam. Note mucky condition of material; November 26, 1973; Bureau of Reclamation photo by J. A. Renning
1973-11-26
2010-02-02
2007-03-27
P-12-200-3015NA Klamath Project - Oregon-California. Repair area on Gerber Dam showing dowels and snap ties. The snap ties are tied off to form wires from the initial construction. The dowels have been grouted in place with quick setting cement...
1974-04-14
2008-12-10
2006-05-16
CN-12-201-538NA Klamath Project. View of water "boil" from discharge valves in left abutment area of Gerber Dam. Discharge was about 130 cfs; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-11
2007-03-28
CN-12-201-529NA Klamath Project. View from left abutment area of Gerber Dam, showing Safety Buoys in place; May 22, 1975; USBR photo by A. L. Bardal
1975-05-22
2010-05-05
2007-03-28
CN-12-201-413NA Klamath Project - Oregon-California. Erection of footbridge at Gerber Dam; April 30, 1974; Bureau of Reclamation photo by Bill Cummings
1974-04-30
2010-03-10
2007-03-27
CN-12-201-405NA Klamath Project - Oregon-California. Face of Gerber Dam showing the left closure slot area where concrete was repaired; May 8, 1974; Bureau of Reclamation photo by J. A. Renning
1974-05-08
2010-03-09
2007-03-27
CN-12-201-336N Klamath Project - Oregon-California. Crest of spillway - Gerber Dam. Plunge pool excavation and concrete removal may be seen on right; December 19, 1973; Bureau of Reclamation photo by C. D. Lawrence
1973-12-19
2010-02-04
2007-03-27
CN-12-201-327NA Klamath Project - Oregon-California. D-8 dozer moving material below Gerber Dam. Material is being placed on access road on south side of canyon; November 26, 1973; Bureau of Reclamation photo by J. A. Renning
1973-11-26
2010-02-02
2007-03-27
26 - 50 of 260 Items    << < 1 2 3 4 5 6 7 8 9 10 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press