Neogene rocks of the Deschutes basin include the middle Miocene
Columbia River Basalt Group and Simtustus Formation, and late Miocene
to early Pliocene Deschutes Formation. Assignment of Prineville
chemical-type flows to the Grande Ronde Basalt of...
1985-11-19 (iso8601)
|
The northwest-trending Neogene Tualatin basin in northwestern Oregon is a pull-apart
basin with approximately 750 m of post-middle Miocene structural relief. Gently
tilted uplands capped by Columbia River Basalt Group surround the synclinal basin...
1996-04-18 (iso8601)
|
XX 219 Dail R., Alaska. (188)
XX 220 Ray R., Alaska. (188)
XX 221 Tozitna R., Alaska. (188)
XX 222 Cowen Cr., Alaska. (188)
XX 223 Melozitna R., Alaska. (188)
XX 224 Koyukuk R., Alaska. (188)
XX 225 Kanuti R., Alaska. (224)
XX 226...
|
W.P.A Camp Kettle and headquarters of the Columbia River Reservoir clearing project.
1940-03-27
2024-11-02 |
Blackmore was a smooth hand at the game himself, I had a sort of sneaking idea that it was the kind of a thing a man ought to be sensitive about, like having had smallpox or a sister in the movies. I need not have worried, however. "You bet he was...
2004-08-09
|
company (the Willamette being wholly in the State of Oregon) has the right to act under the law of the State authorizing the construction of this bridge, but in so doing will subject itself to the risk of future Congressional action, and it...
|
Diary of Sam F. Gill, 1 vol., 1880-1900,
regarding his duties as an engineer on steamboats operating on the Columbia
River, with information about personal and family activities.; Diary of Sam F. Gill, 1 vol., 1880-1900, regarding his...
|
to do only a small amount of work before we are driven off by the spring rise from the Snake River in February.
In the survey, preparation of plans, estimates, and models, I am greatly indebted for valuable assistance to Assistant Engineer C. M....
|
OTHER BUYERS OF BONNEVILLE-GRAND COULEE POWER
Privately owned utilities:
Columbia River power is also sold to privately owned utilities subject to the general preference given public bodies and cooperatives, and subject to cancellation of...
2004-06-28
|
View of a bridge crossing the Columbia River Gorge at Celilo Falls Water level is low and the falls are visible in the background. Mountain ranges are visible on the right hand bank.
2004-03-24
|
An engraved printer's block with a map of the Columbia River on its surface.
2004-03-24
|
Source PI-17, 24
Tentative Disposition
F
Problem or Area of Concern
6. Can the Corps be trusted to evaluate citizen impact fairly, and not distort it for the Corps' own self-serving promotional interests? The Corps' record of...
|
Central spill and left fishway taken from middle fishway at Rock Island Dam
1940-06-30
|
Source
F- 7
PI-83, 106, 107
WI-55 SI-74 F-12
Tentative Disposition
F C
Problem or Area of Concern
2. Under certain conditions, restrictions on speed of ships and barges are necessary for reasons of public safety and erosion of...
|
Left trap at the Rock Island Dam during the summer
1938-11-30
|