Results

2051 - 2075 of 5942 Items    << < 78 79 80 81 82 83 84 85 86 87 > >> 
Thumbnail
Title
Description
Dates
362 REPORT OP THE CHIEF OF ENGINEERS, U. S. ARMY. tablished at various points to indicate to pilots, captains, and those interested in navigation, the stage of water on crossings and places of difficult navigation. On the 1st of...
2006-06-16
This report collects the documents generated as part of a two year effort to catalogue the variety of water quality and quantity data that has been collected in the Columbia Basin Trust region of British Columbia. Through the cataloguing effort, a...
2014-01-01
We investigated colony size, productivity, and limiting factors for five piscivorous waterbird species nesting at 18 locations on the Columbia Plateau (Washington) during 2004–2010 with emphasis on species with a history of salmonid (Oncorhynchus...
2014-11 (iso8601)
1 view; 23 x 47 cm. Bird's-eye view. View Columbia Basin Irrigation Project map on inner fold: http://kaga.wsulibs.wsu.edu/zoom/zoom.php?map=wsu185 This is part of a promotional pamphlet intending to lobby for passage of funding...


insignificant stream as viewed from the Columbia, and one would never suspect that it is navigable for good-sized stern-wheelers for a considerable distance above its mouth. On the right bank of the Columbia, just above the mouth of the Okinagan,...
2004-08-16
In June of this year Walla-Walla valley alone shipped down the Columbia, San Francisco and New York markets, over five hundred tons of' flour, and has remaining for shipment at this date at least twenty thousand barrels. Cheap freight is of the...
2004-11-03
WW-20 CLATSKANIE RIVER, OREG. APPROPRIATIONS. 1899, $13,000, 99, 3247. 1910, 5,200, 10, 2411. 1912, 1,000, 12, 2831. Total, 19,200 (less $324.53 reverted to surplus fund, $18,875.47, 12, 2831). COMMERCE. Description of, 95, 3597;...

APPENDIX T T----REPORT OF CAPTAIN SYMONS. 2709 As there were no winter freshets last season and the bar channel having shifted, vessel masters were very cautious and refused to come in; only 1 vessel came in dur- ing the...
2006-06-16
Excluding the repairs to the old dredger and surveys and office expenses, the net cost per cubic yard of the dredging would be 30.8 cents per yard, the repairs alone costing $3,016.48. In April a large troublesome snag, which had lodged during...

Middle Columbia "Fuller use of water resources of the middle basin will entail a very large extension in the acreage of irrigated farm land, a great increase in power development, and further improvement of the Columbia for navigation....

Old dam near mouth of south fork of Grays River
It contains 1,000,000 board feet
1937-06-12
Typical stretch of lower Grays River with splashes from dog salmon
1936-11-10
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1940-02-29
2003-01-01
of the standard velocity distribution in a river such as the Columbia is introduced: Standard Velocity Distribution in a Vertical in Open Flow (17) It is noted the average velocity occurs at approximately 0.6d below the water surface. All...

This is the final step in placing a closure gate. Diversion and care of the river during construction, and unwatering foundations, was bid by MWAK at $3,500,000, but during the CBI contract the task was relatively simple, and bid at only $727,000.
2024-11-02
Document: 89th Congress, 1st Session, S.294, January 6, 1965, page 34
1965-01-06

Available information on aquatic biota of the Willamette Basin was reviewed and summarized to describe current and historical conditions as part of the U.S. Geological Survey's National Water- Quality Assessment Program. Biological parameters...
1997-11-02
A precipitation-runoff model for the Methow River Basin was used to simulate six alternatives: (1) baseline of current flow, (2) line irrigation canals to limit seepage losses, (3) increase surface-water diversions through unlined canals for...
2024-11-02
under the Pacific Southwest Water Plan would be approximately $2.2 billion, including interest during construction. The annual cost, as stated in the Plan, would be approximately $105 million, which would mean an average unit cost of water of...
Notwithstanding the quantity of ink that has been spilt over such questions, only a few things are clear. There was significant over-fishing and habitat disturbance in the Columbia River Basin long before the mainstem dams were built. Snake River...

1382 REPORT OF THE CHIEF OF ENGINEERS, V. S. ARMY. The Oregon Trunk Railway has constructed a bridge over the Columbia River below Celilo to connect its north bank road (of the Hill system) with its new road, now constructed up the...
2006-06-16
High water carries away the Detillion bridge across the Spokane River. Construction is now in progress on a new bridge at a higher elevation on the relocation of primary state highway No. 22
1940-03-05
2024-11-02
78 p. Includes sections of Appendix SS: Report of Capt. William W. Harts, Corps of Engineers; and Appendix TT: Report of Maj. W. L. Fisk, Corps of Engineers. Additional information on these topics can be found by consulting the Indexes to the...
1899-11-02
corresponding to 51 feet at ordinary low stage, but at Eddy Rock, No. 10 of the chart, on the north side of the ripple called Upper Bucking Place, and near the lower end of the rapids, it was discovered that owing either to all oversight on the...

The writer has been assigned the task of preparing information for the flood control, history, and navigation subprojects, the latter being the subject of this report. The objectives of the navigation study are: 1. To determine the navigation...
1970-10-01
2051 - 2075 of 5942 Items    << < 78 79 80 81 82 83 84 85 86 87 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press