Willamette Gas Engine & MachineWorks
368 - 370 East Washington Street, near Union Avenue
Repairing and General Machine Work
Automobile Specialists
Oxide Aceteline Welding
AUTOMOBILES BOUGHT AND SOLD Phones East 655, B 1921 J. A. WEBBER, Prop....
2004-07-06
|
Description of proposed John Day Lock and Dam. See photo 94-0 17 for artist's rendition.
1962-11-24
|
ALL LOCALITIES TREATED EQUALLY The Power Administration is interested only in the soundest growth of each area it can serve 14growth according to natural advantages and the enterprise of leaders in each community. THAT IS WHY Its transmission...
2004-06-28
|
Aerial view looking south over Devils Lake
1941-09-21
|
Front cover of the "Planning your Career" publication
1965-11-24
|
Excavating rock in bed of river. In the foreground is one of several large lava erratics in about the middle of spillway section.
1937-01-14
2024-11-24 |
General view of excavation operations along bank
1936-11-01
|
Distance view of the future site of Grand Coulee Dam.
2024-11-24
|
View of machinery excavating the bank at the Grand Coulee site
1934-03-02
|
Repairs to highway bridge pier No. 2. Shows 36-inch I-beam inside steel caisson around pier and cuts in old concrete pier as keyways for additional concrete
1936-04-01
2024-11-24 |
Specs # 2329, Contract I2r 18156, Contractor, Morrison-Knudsen Company Inc. and Peter Kiewit Son's Co. View looking north showing progress made on pumping plant including office wing, parking area, gantry crane, and storage building P-9 through...
1950-09-25
|
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF OUTDOOR RECREATION
NORTHWEST REGION 1000 SECOND AVENUE SEATTLE, WASHINGTON 98104
Colonel A. R. Marshall Deputy Division Engineer North Pacific Division Corps of Engineers
210 Custom...
|
Looking up from pit #7 in West Powerhouse--natural illumination
1941-02-14
|
Subsection 5.D.3
The impact of water diversion for thermal plant cooling can be minimal or quite a problem, depending on individual circumstances.
Minimal impact would occur if irrigation water already being diverted were used for thermal...
|
Wheelpit R-8 looking downstream from 965 step. East Powerhouse base.
1940-09-25
|
View of the outlet works near the base of the dam. A man is standing in foreground for scale.
1941-06-26
|
View of the spillway section from the left bank
1941-03-03
|
LIST OF ADDRESSEES
INTERAGENCY REVIEW OF AREAS OF CONCERN
CR&T STUDY
Administrator
Bonneville Power Administration P.O. Box 3621
Portland, OR 97208
Regional Engineer
Federal Power Commission 555 Battery St., Rm 415 San Francisco,...
|
Portland District (Cont'd)
PI-53- John I. Frewing
PI-54- Henry G. Curtis
PI-55- Harry Paget
PI-56- Lewis R. Lembke
PI-57- Robert McNeil
PI-58- Kalama Sportsman's Club (Harry Fink)
PI-59- Marsh F. Beall
PI-60- Carl F. Koskela...
|
View of the construction on Grand Coulee Dam
1940-10-23
|
South Coulee Dam--Main Canal Headworks--A view of the headworks structure taken from approximately station 10+00 on the main canal; the main canal pipe crossing is shown in the immediate foreground
1949-06-08
|
LIST OF SOURCES
Federal
F-1 - Senator Len B. Jordan, Idaho
F-2 - Senator Bob Packwood, Oregon
F-3 - U.S. Fish and Wildlife Service
F-4 - U.S. Dept. of Agriculture - Forest Service, Missoula, Montana
F-5 - Bonneville Power...
|
Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position
1943-03-23
|
Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside...
1947-06-19
|