Results

5401 - 5425 of 5942 Items    << < 212 213 214 215 216 217 218 219 220 221 > >> 
Thumbnail
Title
Description
Dates
Image Caption: SWISS GUIDES' VILLAGE NEAR GOLDEN --page break-- Golden is the northern terminus of the Kootenay Central Railway (a part of the Canadian Pacific system) which there connects with the main line of the Canadian Pacific Railway,...
2004-07-07
Image of a permanent community structure at Coulee Dam
1937-05-07
Top of "ice dam" showing hose connecting refrigerating points, 3-inch pipe.
1937-11-01
2024-11-24
River fill at leaky cofferdam. Upstream cross-river cofferdam in the distance.
1937-04-01
2024-11-24
Rendition of proposed John Day Lock and Dam. See photo 94-0 16 for description.
1962-11-24
This is a chart indicating rate differences in the northwest. The rates are distinguished by city population, monthly costs and annual costs to homes and commercial entities.
2004-06-28
Shown here is the town of Boardman on the left side of the picture, showing U.S. Highway 30 to the upper or south of the picture. At the lower left hand corner of the picture may be seen the Union Pacific Railroad right of way. The entire town of...
1965-11-24
that, eventually, it would prove to be the better one. Accordingly the dredger was placed at the west end of the proposed cut. After working tour days, it was found that the dipper would not bring up more than one-half of its proper quantity. The...
2005-08-15
These are graphic images of dams and a map of proposed dams.
2004-06-24
Estimates of energy requirements for the development of the Pacific Northwest, along with proposed projects to meet those needs.
1960-11-24
U. S. Government Printing Office, Washington : 1940
2004-06-23
An open letter advocating jobs with the Corps of Engineers to new engineering graduates
1961-11-24
Image Captions:
The Old-fashioned Stone Arch Bridge Across Eagle Creek.
The Beautiful Concrete Arch Bridge Over the Water Fall at Sheppard's Dell. Length of this Bridge is 150 Feet.
Twelve Hundred and Sixty Feet of this Side-Hill...
2004-06-17
Jackhammer men drilling weathered bedrock. This view shows rock that underlay the channel of the river, now flowing outside the cofferdam cells and block 40.
2024-04-24
2024-11-24
Men install piping during early phase of construction.
1936-11-09
Distance view of the future site of Grand Coulee Dam. Excavation equipment may be seen in lower-left.
1934-04-03
South end of west cofferdam being removed by sluicing fill through holes out in the steel walls. West-mix in the distance.
1936-08-08
2024-11-24
Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. This aerial view of the Grand Coulee Dam area shows the status of progress on the construction of Grand Coulee pumping plant and feeder canal. The...
1949-09-21
Berm of Gravel west of section "E" of west cofferdam transported by conveyor from east side pit and placed by 36-inch belt, material diverted at suspension bridge tower.
1936-03-31
2024-11-24
Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Subcontractor: Consolidated Western Steel Corporation. Progress view of 12-foot diameter pump-discharge pipe emerging from P-4 tunnel. The two top...
1949-10-06
Residency No. 3, Specifications 2329, Unit R-3, Second Stage Concrete, Barrel Pour No. 9 to Elevation 977.0 and Pour No. 10 Elevation 978.87 Slab, Right Powerhouse. June 17, 1949. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons'...
1949-06-17
IN REPLY REFER TO: Land Services United States Department of the Interior BUREAU OF INDIAN AFFAIRS PORTLAND AREA OFFICE POST OFFICE BOX 3785 PORTLAND, OREGON 97208 A. R. Marshall Colonel, Corps of Engineers Deputy Division Engineer...

General view of reinforcing steel at East Powerhouse base
1940-10-07
South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west...
1948-09-02
Subsection 2.0.3 [2B2] In order to curtail our energy demand it may be necessary to spread the maximum use out over a longer period by requiring three shift operations in factories and revolving weekends so Saturday and Sunday are...

5401 - 5425 of 5942 Items    << < 212 213 214 215 216 217 218 219 220 221 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press