Portland District (Cont'd)
PI-85- A. O. DeFrate
PI-86- Clark W. Cox, Jr.
PI-87- Frank F. Dinsmore
PI-88- John P. Hounsell
PI-89- Ernest A. Jager
PI-90- Orville L. Cram
PI-91- Richard W. Pearson
PI-92- Charles Jackson
PI-93-...
|
South Coulee Dam--Main Canal Headworks--View taken from east bank of the approach channel showing the false work for construction of the gate section of the headworks.
1949-05-03
|
Oregon
0-1 - Fish Commission of Oregon 0-2 - State Water Resource Board 0-3 - Oregon Wildlife Commission
0-4 - State Parks and Recreation Department
0-5 - Central Oregon Intergovernmental Council
Idaho
I-1 - Art Manley, Idaho State...
|
Riveting together the sections of the #1 Shasta turbine scroll case in pit 7. On the left is the heater. In the center, a man is bouncing a heated rivet to knock off the oxidized scale and on the right are the riveters waiting for the rivet.
1942-02-23
|
Bryant standing by the South Toutle shelter on the first night's stopping place on the pack trip
1941-05-21
|
Man stands on the rotor--which nears completion
1941-07-05
|
One step in the assembly of rotor of Shasta generators to be used in west power house
1942-08-21
|
Excavation behind low Wakefield cofferdam. Shore-end of upstream cross-river coffer at left. Across the river are cells in section "D" of west cofferdam. Upper right is main soil conveyor to Rattlesnake canyon.
1936-09-14
2024-11-24 |
Workman using a micrometer on L-6 scroll case bolts after tightening.
1943-05-26
|
Source
Tentative Disposition
Problem or Area of Concern
1. (Cont) A. Effect of peaking on downstream passage time (Cont)
2. In estuaries
3. In bypass facilities at projects
B. Effect of peaking on stranding of juveniles
1. In...
|
Excavation in upstream end of diversion channel - behind sections "C" and "D" of west cofferdam.
1936-08-01
2024-11-24 |
Close up view of strange rock formations
1938-11-02
|
Downstream cross-river with all cribs in place
1936-12-11
2024-11-24 |
Man works with concrete during construction of Grand Coulee
1940-07-26
|
Timber cribs for cross-river cofferdams, stored in upstream end of diversion channel. 950 elevation cofferdam across the river; also shore-end of upstream cross-river cofferdam; part of high placing trestle; and Eastmix.
1936-09-27
2024-11-24 |
Reboring drum gate girder. Machine shop--powerhouse
1941-01-22
|
Specifications No. 2329. Picture Series 18532-3 through 18537-3. Morrison-Knudsen Co., Inc., and Peter Kiewit Sons' Co., subcontractor, Consolidated Western Steel Corp., Electric City Yard. A view of the process of mounting the stiffener rings on...
1949-03-01
|
Hitch used for lifting on end of 85 ton shaft
1941-02-11
|
Tentative Disposition
Source
F-7 F-10
B
Problem or Area of Concern
3.(Cont) COMMENT: Regulation of Lake Pend Oreille is primarily influenced by system power requirements although constraints are recognized in the interest of...
|
Specifications No. 2475, March, 23, 1949. This is picture No. 4 of a series of thirteen showing movements of the floating caisson on its initial trial run from the drydock to the spillway bucket. The caisson is at station A29+98.38/B5+97.92 at...
1949-03-23
|
Problem or Area of Concern
Source
Tentative Disposition
SI-70
SI-75 PI-102
F A
6.(Cont) COMMENT: to make some adjustments of thermal plant output. As the number of thermal plants increase the load fluctuation which will be imposed on...
|
View towards northwest from deflection sheave #5, showing large rocks on riprap with their identifying numbers painted on them. A similar photo taken after 1948 high-waster will show to what extent the large rocks are moved by the high water. See...
1948-03-05
|