Testing a concrete specimen--it appears to have failed
1940-10-07
|
close up view of the three dimensional model
1938-11-03
|
Transporting spider to the powerhouse--Grand Coulee in background.
1941-02-17
|
Problem or Area of Concern
Source
WI-9, 34, 60 SI-74
SI-76 PI-59 SI-76
Tentative Disposition
EE. Regulatory Alternatives
1. Users should pay for use of navigation facilities. (G.B. 27)
Navigation companies should share the...
|
Grand Coulee Dam Seismograph Station, showing seismograph equipment before installation, arranged only for photographic purposes. Dr. Dead S. Carder of the U.S. Coast and Geodetic Survey is simulating the adjustment of position of galvanometers on...
1942-09-16
|
close up view of three diamond core drill bits
1941-09-26
|
Problem or Area of Concern
Source
Tentative
Disposition
A
F-7 F-5
4.(Cont) COMMENT: Definite site planning for commercial thermal plants is not a direct responsibility of the CR&T study. The above potential development sites are known...
|
TABLE OF CONTENTS (Cont'd)
Part Page SECTION 6: RECREATION
A.. Possible Operational Improvement of Existing
Projects III-70
B. Recreation Demand Forecast III-73
C. Alternatives and Supplemental Development III-74
D. Management...
|
Photo of Long Lake Dam taken for display purposes
1949-04-06
|
Objective III:
Objective IV:
2. Develop a program for removal or replacement of signs which do not conform to the sign guidelines.
3. Minimize visibility of utility structures, including railroad equipment, using screening, natural...
|
Land Exchange
Hardship acquisitions are mandated in Section 9(c) of the Act. This section directs the Secretary to give prompt consideration to cases in which the landowner will suffer hardship if the government does not acquire the land...
|
Map Symbol S4
Map Symbol S5
Ortley Overlook
SITE DESCRIPTION: This site offers a superb view of Rowena
Plateau and of The Dalles. At 2000 feet elevation, there are off-site views of Mount Hood and Mount Adams. There is currently no road...
|
Excavation for block 40, cross-river conveyor trestle at right - crossing over cell cluster "D" of west cofferdam.
1935-09-26
2024-11-25 |
10206
CONGRESSIONAL RECORD — SENATE
July, 16
great populations are concentrated there is no way people can go underground and be safe from the effects of the hydrogen bomb. They have decided that the moving of the population probably will be...
2009-05-01
|
Compliance
with Section
106
Discovery
During
Construction
excavations, or other measures which are proposed to mitigate effects.
For Federal or Federally assisted undertakings, the Forest Service or other responsible agency will...
|
Site of Government Camp in foreground. North portion of contractor's camp across the river - air-port in the distance.
1934-06-27
2024-11-25 |
4. Forest practices, and all land disturbance associated with forest practices, shall not be visually evident when viewed from KVAs.
5. Use of non-native plant species for landscaping or revegetation will not be allowed unless the applicant...
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1946-05-17
|
Grand Coulee Dam Plan of West Cofferdam 1934
1935-04-17
2024-11-25 |
Exemptions
(together with its support structure if the sign is freestanding).
1. Ordinary repair, maintenance, and cleaning provided no changes occur in size, structure, color or message.
2. One political sign per parcel road frontage. The...
|
“The purpose of the 1979 survey was to obtain standing stock biomass estimates of shrimp off Oregon in the area between 35-145 fm from Cape Blanco (lat 42°54′ N) to the Columbia River (Lat 46°15′ N) and to determine age and sex composition and...
1980-03 (iso8601)
|
Intensity Zone 3:
for no more than 20 vehicles, and other limited, similar improvements.
c. New roadways or roadway improvements designed to serve facilities included under this article and recreation users, including vista overlooks....
|