The lower race of the east thrust bearing of the 51 upstream west outlet tube ring-seal gate at elevation 1036. It is part 19, drawing 222-D-2106, Specifications 744
1942-09-28
|
Columbia Basin Project, Irrigation Division. The operator of the Winchester development farm is shown moving a 4 inch wheel move sprinkler lateral through the use of a ratchet. The lateral is 720 feet in length and can be moved 60 feet in...
1950-04-17
|
Cracked 18"" irrigation pipe on Pasco Pump Laterals PP-6.0-0.5-1.3 Station 86+74.5-87+01.5 looking upstream. Pipe burst due to internal pressure when testing pipe line. Pipe laid in October, 1946. Tested October, 1948. A.F. Swanson, photographer
1948-11-09
|
Removing rock in area east of block 40; elevation 1024 trestle under construction toward east end, June 04, 1937
1937-06-04
2024-11-06 |
Columbia Basin Project, Irrigation Division, West Canal Second Station, Specifications No. 2541. Morrison Knudsen Company Inc., contractor. Making field control tests for entrained air in canal lining concrete using a Press-Ur-Meter type air meter...
1950-05-17
|
A slide on the east forebay slope which occurred February 28, 1937. The top of the broken area is at elevation 1060 and the toe of the slide is resting against a rock outcrop at about elevation 900.
1937-03-02
2024-11-06 |
Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Photo of highway crossing at station 666+76 looking south, downstream. The maximum water surface in reservoir, which is located upstream from this structure, is 10 feet...
1950-07-14
|
West Canal, Specs. 1286, Winston-Utah Co. Finished canal, with curing compound applied. Sprayers work from platform nearest the camera, this moves independently from the paver.
1948-04-07
|
Exposed bedrock in the center section, looking west toward block 40. Derrick equipment mounted on the steel cell on the left, and other equipment to be mounted on the timber crib located on the rock, are to be used for cleanup of rock, and for...
1937-04-29
2024-11-06 |
Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia
1941-05-22
|
the prosecution of the works of improvement at this locality during the current year will be in part a continuation of the method heretofore adopted in connection with a more extended system of dams and jetties, the plan of which is herewith...
|
This is a map with legend symbols showing public utility districts and principal municipal systems in Washington, 1940.
2004-06-28
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is a close-up of the fabrication of the half hoops. The straight bar is fed to the...
1949-09-09
|
Columbia Basin Project. Irrigation Division, Bacon Tunnel, Specifications 1236, T.E. Connolly, Inc., Contractor. Looking upstream at the outlet portal of the Bacon Tunnel. Portal Structure and open transition is complete except for backfilling and...
1948-11-22
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, shows the Schedule II siphon concrete placed to date. Dark concrete...
1949-10-16
|
Excavating upstream end of diversion channel behind west cofferdam sections "C" and "D";
1936-07-01
2024-11-06 |
Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream from station 1992+45 showing placement of concrete at approximate Station 1993+40 and placement of reinforcement steel at...
1950-04-04
|
Upstream cross-river cofferdam extending from east bank.
1936-09-27
2024-11-06 |
Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View of the Headworks structure taken from the left canal bank opposite station755+00 looking upstream and showing start of backfill work behind the outlet warp...
1950-03-28
|
Columbia Basin Project, Irrigation Division, West Canal. Sep. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View taken of a test weld. One test weld is made for every 50 production welds. This is then tested for yield point and...
1947-05-22
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station745+80 to Station 1101 +29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc....
1949-09-28
|
1 map: col., 36 x 33 cm. Plat map of a portion of the Whitman County city of Pullman. Scale 1.5"=1 mile. See the other part of Pullman: http://kaga.wsulibs.wsu.edu/zoom/zoom.php?map=wsu169
The village...
2024-11-06
|
makes it one of the important regional transportation and distribution centers of the Pacific Coast.
This section of the Columbia is subject to tidal action as far up-stream as Bonneville Dam. The tidal range at Portland is small, not exceeding...
|