Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Abutments and pier for the G.N.R.R. bridge at canal station 1224+57. Backfilling is complete around the abutment at the right and nearly completion that at the left....
1950-06-16
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bridge bents and abutments for the county road bridge at station 1151+87. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications....
1950-06-16
|
Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station 745+80 to Station 1101+29.0--Main Canal. Contractor: Western Contracting Corp. Front view of...
1949-08-09
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bucyrus-Erie 51-B dragline and dozer removing snow from the canal at about station 1155. Note the size of the blocks of snow as compared with the man and the dozer...
1950-03-24
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Canal trimmer, build by Guntert and Zimmerman for the contractor. Lining machine is setting behind the trimmer. Roller in the foreground is a Hyster grid roller used...
1950-04-10
|
Columbia Basin Project, Irrigation Division I, Main Canal, Specifications 1236, J. A. Terteling and Sons, Inc., Contractors. Main canal looking upstream from sta. 33/00. Monighan dragline building up right bank with borrow material prior to pacing...
1948-05-04
|
Hotel DALLES The Dalles, Oregon
EIGHTY-FIVE MILES FROM PORTLAND ON THE COLUMBIA RIVER HIGHWAY A Modern Hotel - 110 Rooms European Plan First Class Cafe We cater to every one who travels and appreciate your patronage Hotel adjoins passenger depot....
2004-06-24
|
Columbia Basin Project, Irrigation Division I. Bacon Tunnel, Specifications 1236, T.E. Conolly Inc., Contractor. Inlet portal of the Bacon Tunnel showing the full size of tunnel and steel supports in position
1947-07-23
|
Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is...
1950-10-31
|
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Columbia River Dam Excavation Plan and Sections Schedule No. 2
1933-10-18
2024-11-25 |
Document: Water and the West by Senator Henry M. Jackson, November 5, 1965, page 7
1965-11-05
|
2024-11-25
2024-11-25 |
XX-110(c) POLSON BAY, FLATHEAD LAKE, MONT.
APPROPRIATIONS. 1910, $6,000, 10, 2436.
COMMERCE.
In 1911, about 72,466 t. in Flathead Lake, 12, 2865.
ENGINEERS.
Chief of Engineers. R., 10, 995, 998; 11, 1053; 12, 1263.
In charge:...
|
in a fog, and became a total wreck. During the same month the pilot schooner Cousins grounded on the sands at the mouth, was abandoned and totally wrecked on Clatsop Beach.
It is judged that the present appropriation will permit construction of...
|
[unrelated material omitted]
DEFENSES OF THE COLUMBIA.
Defenses at the mouth of the Columbia River, Oregon, and Washington Territory, in charge of Capt. C. F. Powell, Corps of Engineers.—The defenses consist of Fort Stevens, an...
2006-02-27
|
navigation from Portland to Eugene City and on 12 miles of tributaries, making a distance of 184 miles. The work consists in snagging operations, bar scraping, and for the reach between the Willamette Falls and Corvallis, in the contraction of...
2006-02-13
|
A black-and-white photo. The caption in white ink at the bottom reads "Noggi Wah-kee-na-falls Columbia Highway Ore." The waterfall tumbles down from a cleft in the cliffs and descends in tiers, at last running under an arched stone bridge to form...
2004-08-03
|
It was on the morning of October 1 when I reached Hell Gate, put ashore on the left, in the usual eddy, climbed the steep sides of a rough bench, and made an examination of its full length of about a half-mile. It had none of the repelling...
2004-07-19
|
Columbia Basin Project, Irrigation Division, Pasco Settlers. Robert McNulty, Unit 1, whose farm is first on the lateral distribution system, works on a ditch around his fields. Much of his acreage is irrigated by a wooden flume, part of which may...
1950-04-28
|
Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. Start of embankment construction on Lateral W-25 station 4+00 to 12+50. Borrow area is on right side of lateral within the R/W. Man in foreground is standing at left toe stake...
1950-05-16
|
Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking upstream at the completed lining from the Baily Bridge at Ephrata. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above...
1950-09-03
|
Image Caption: THE OLD VOYAGER, AGE 69
THE COLUMBIA UNVEILED Being the story of a trip, alone, in a rowboat from the source to the mouth of the COLUMBIA RIVER Together with a full description of the country traversed, and the...
2004-06-30
|
Columbia Basin Project, Irrigation Division. West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. Contractor. View of canal section, looking east from station 256, shows rock drilled and loaded and nearly ready for shooting....
1946-12-05
|
Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 2. View looking northwesterly into ditch being excavated for W 645 drain culvert under third section of the West Canal at station 1632.25. The...
1950-04-04
|
Columbia Basin Project, Irrigation Division, Specifications No. 2541, West Canal, Second Section. Contractor: Morrison-Knudsen Inc. View shows construction of bins and rescreening plant installed by subcontractor M.E. Nelson Construction Company...
1950-03-21
|