Opposite the cliff the river wall sloped slightly and was thickly covered with a dense growth of evergreen. The heavy roar we had been hearing for hours was still muffled. Evidently the main disturbance was somewhere beyond the bend at the cliff....
2004-08-09
Construction in progress on the control works and diversion dam for supplying Icicle River water to the salmon holding ponds at the Leavenworth migratory fish control station.
1939-12-22
2024-11-04
Proposals were received from three parties, and the work was awarded to Messrs. Grant & Stone, the lowest bidders, for Squally Hook, at $23, United States currency, per cubic yard, and to Mr. J. B. Montgomery, the lowest bidder, for Pine-Tree...

I could be transported by water at cheap rates compared with those of the two railroads running on each side of the river. All work in the construction of wing-dams and the displacement of bowlders was suspended at the close of the month of...

One new wood-scow $529 41 Dredger . 7,919 98 Repairs 3, 016 48 Snagging -- - 56 50 Superintendence, surveys, and office expenses _ 1, 742 88 — $46, 330 08 Balance on hand June 30, 1873 7, 524 72 Appropriated March 3, 1873...

HARBORS AND RIVERS ON THE PACIFIC COAST. IMPROVEMENT OF RIVERS IN OREGON. Officer in charge, Major R. S. Williamson, Corps of Engineers, to April 11, 1871; since that date, Major IL M. Robert, Corps of...

Placement of last crib in downstream cross-river coffer. Overhead is aggregate suspension bridge. Left center is east end of 1024 el. placing trestle.
1936-12-02
2024-11-04
Problem or Area of Concern SI-75 F-5 PI-60 Tentative Disposition A E F-7 Source 9. Hydropeaking power costs and effects have not been fully studied. Peaking hydroelectric power may not be the cheapest. Power storage should be...

Gail Falls on the Cispus River is 200 yards below Cat Creek
The falls are 30 feet high and 8 feet wide
Quartz Creek is a tributary to the Cispus River
1936-10-22
Walupt Lake (located at head of Cispus River) from west or outlet end
1936-10-25
Niggerhead Creek, tributary to the Cispus River shown 1300 yards above road bridge
There is a log jam in the background
The stream is 40 ft wide
1936-10-22
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1936-05-31
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1935-03-16
Funding Funding arrangements vary, but all of the compact commissions are dependent for their finances on appropriations from the compacting parties. In all cases, the signatory parties are responsible for the salaries and expenses of their...

By the spring of 1943 the floor of the structure had become unsafe for further use, and being no longer necessary for trucking operations, the U.S.B.R. began to dismantle it. During the fall of 1946 the U.S.B.R. removed the center pier, leaving...
2024-11-04
2024-11-04
Document: 89th Congress, 1st Session, H.R. 4671, February 9, 1965, page 23
1965-02-09

Document: 87th Congress, 1st Session, House of Representatives, Report No. 1125, Public Works Appropriation Bill, 1962, September 6, 1961, page 37
1961-09-06
2006-09-19
Document: no title, September 8, 1961, page 7
1961-09-08
2006-09-19
26 PUBLIC WORKS APPROPRIATIONS, 1962 State and project Revised budget estimate for fiscal year 1962 Allocation Construction Planning Construction Planning Texas-Continued Red River levees and bank stabilization below Denison Dam, Arkansas,...
ulated no local enterprises of great importance for the distribution of these goods. Development in 1940.—By 1940 this picture had changed completely. The scattered islands of land irrigated in 1900 for the most part had been made parts of a...

wherewithal to make ecosystem recovery work. With the competitive revolution in the energy industry, a new balance point between hydropower economics and ecosystem programs is needed. There are many issues surrounding the hydropower system's...

Little Dalles river channel widening. This view shows the widened area, at the right, about to be completely submerged at the lower end. The flow in the river is still in the original channel.
1941-04-17
2024-11-04
River managers often seek to understand habitat availability and quality for riverine organisms within the physical template provided by their landscape. Yet the large amount of natural heterogeneity in landscapes gives rise to stream systems...
2012-12-01
for work above Corvallis; to place steam propelling power on the present snagboat; to remove portions of Bissell's and Dove's rocks above Oregon City; and to make a complete survey between Corvallis and Portland, a distance of 114 miles. The...

2701 - 2725 of 5942 Items    << < 104 105 106 107 108 109 110 111 112 113 > >> 