ciously with a description of running Box Canyon. But the gimlet-eyed thin one asked him what he got for doing a thing like that, and promptly their interest faded. And why should they have cared to waste time over a mere...
2004-08-16
|
Label on verso: WORK PROJECTS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date: 4-28-41; OP No.; Zone: 1; County: Stevens; City: Kettle Falls; Neg. 12069;
Title: Columbia Basin Clearing Project; Caption: Three bridges that now cross the...
2024-11-26
|
The objects of the joint investigations were to provide a general plan for the development and settlement of the Columbia Basin area as a whole, and detailed plans for areas to be irrigated. The topographic surveys and land classifications of the...
|
Dicamptodon is the single, extant genus of the
ambystomatid subfamily Dicamptodontinae. Two species, D.
ensatus (Eschscholtz) and D. copei Nussbaum are recognized.
D. ensatus is found in the forested, mountain regions of
northwestern California...
1971-11-08 (iso8601)
|
Save Our Summers (SOS), a nonprofit environmental advocacy group, was organized in 1995 to raise public awareness about the environmental and health hazards of the agricultural practice of grass burning, and to strengthen regulations to protect...
|
Image Caption: SAILING ON LOWER ARROW LAKE --page break-- and about a hundred yards from the shore, I noticed the corner of a building and went ashore to investigate. I found a one room log cabin containing a large hunk, table, and a dilapidated...
2004-07-14
|
place almost invariably between those dates. The United States dredger has always been able to commence work about the 5th or 10th of August.
It is expected to use a portion of the appropriation in executing as .far as possible the plan of...
|
the Columbia, to be able to more than fill the channel at the mouth of the Willamette, when carried into it, held there, and deposited by the opposing currents of the waters of the two rivers. As reported, some 8,000 cubic yards of material...
2005-08-15
|
in using his power at the right time and in the right way. A hundred-ton tugboat would have been helpless in stopping the raft once it started to go in the wrong direction. The trick was to start it right and not let it go wrong, Ike...
2004-08-16
|
REPORT OF MR. R. A. HABERSIIAM, ASSISTANT ENGINEER.
UNITED STATES ENGINEER OFFICE, Portland, Oreg., June 8, 1877.
Sir,: I have the honor to submit the following report of my surveys on the Lower Willamette and Columbia Rivers, made in...
|
go down the River with me to Surprise Rapids after returning from a visit to his home at Golden.
In the meantime I had no way of keeping occupied and as I had lost a pair of spectacles on the Blackwater trip and thought they could possibly be...
2004-07-12
|
place almost invariably between those dates. The United States dredger has always been able to commence work about the 5th or 10th of August.
It is expected to use a portion of the appropriation in executing as .far as possible the plan of...
|
1 map : 26 x 43 cm. Scale: 1 in. = 400 ft. Inset: Section thru dam
This is a very preliminary design map showing how a dam could be placed at Grand Coulee. Initial excavation for a dam there didn't begin until 1933, by which point...
2024-11-26
|
1 map ; 71 x 55 cm. Relief shown pictorially and by hachures. Shows the north and south routes of the two vessels along the coast of northern Oregon and Washington, and along the southern coast of British Columbia. Includes topography along the...
1873-11-26
|
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Denver, CO. Original Jan 2, 1932; Revised November 16, 1934.Drawn C.A.M.-C.B.G.
1934-11-19
2024-11-26 |
Information on fall, channel and the best means of running them I would have to pick up as I went along.
I shoved off from Pasco Ferry at nine o'clock in the morning of Sunday, November fourteenth. With Roos and his blanket-roll, camera and...
2004-08-23
|
The status of the double-crested cormorant (Phalacrocorax auritus) in western North
America was last evaluated during 1987–2003. In the interim, concern has grown over the potential
impact of predation by double-crested cormorants on juvenile...
2014-09 (iso8601)
|
Logistic regression was used to relate anthropogenic and natural factors to the occurrence of elevated nitrate concentrations in the Columbia Basin GWMA and develop models that predict the probability that nitrate concentrations in ground water...
2024-11-26
|
size of farm units. Many fruit farms involve only a few acres of land, whereas wheat farms not uncommonly include a thousand or more acres. Eleven percent of the farms are under 10 acres, and 18 percent are over 1,000 acres. Notable concentration...
|
Speech given to the 7th Congress of the International Commission on Irrigation and Drainage regarding drainage planning studies, designs and construction on the Columbia Basin Project.
1969-04-15
2007-01-02 2007-01-02 |
Speech about the Columbia Basin Project.
1967-09-23
2007-01-02 2007-01-02 |
PROJECTS.
By Maj. Handbury, 1891, closing chute behind Hayden Isld. opposite Vancouver by a pile, brush, and r. dam about 3,000' 1. and 4' high above 1. w., to throw water passing down this chute at this stage into main chan. to remove sand bar...
|
[Blank page] --page break-- DOWN THE COLUMBIA CHAPTER I
PREPARING FOR THE BIG BEND The itinerary of our Columbia trip as originally planned in Los Angeles called, first, for an expedition to the source of the river, next, a voyage by boat...
2004-08-03
|
23 x 47 cm. View Bird's-eye map on verso: http://kaga.wsulibs.wsu.edu/zoom/zoom.php?map=wsu206
This is part of a promotional pamphlet intending to lobby for passage of funding from the 70th Congress (1928). None of the various projects...
|