Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Subcontractor: Consolidated Western Steel Corporation. Progress view of 12-foot diameter pump-discharge pipe emerging from P-4 tunnel. The two top...
1949-10-06
Residency No. 3, Specifications 2329, Unit R-3, Second Stage Concrete, Barrel Pour No. 9 to Elevation 977.0 and Pour No. 10 Elevation 978.87 Slab, Right Powerhouse. June 17, 1949. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons'...
1949-06-17
IN REPLY REFER TO: Land Services United States Department of the Interior BUREAU OF INDIAN AFFAIRS PORTLAND AREA OFFICE POST OFFICE BOX 3785 PORTLAND, OREGON 97208 A. R. Marshall Colonel, Corps of Engineers Deputy Division Engineer...

General view of reinforcing steel at East Powerhouse base
1940-10-07
South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west...
1948-09-02
Subsection 2.0.3 [2B2] In order to curtail our energy demand it may be necessary to spread the maximum use out over a longer period by requiring three shift operations in factories and revolving weekends so Saturday and Sunday are...

East spillway, showing elevator shaft.
1941-06-30
Aim crosshairs for aligning drum gates.
1941-03-06
Director Oregon Wildlife Commission P.O. Box 3503 Portland, OR 97208 Director Fish Commission of Oregon 307 State Office Bldg. 1400 SW Fifth Ave. Portland, OR 97201 Director Dept. of Fisheries 115 General Administration Bldg....

Portland District (Cont'd) PI-69- A. B. Hughes PI-70- E. John Rumpakis PI-71- Mrs. Rolland M. Johnson PI-72- Dennis A. Larson PI-73- Mrs. Gayle A. Miller PI-74- Robert C. Peterson PI-75- Glenn S. Chambers PI-76- Norman F. Kujala...

Spillway Section--downstream face
1940-10-24
Walla Walla District (Cont'd) WI-18- Sierra Club (Palouse Group) WI-19- Sierra Club (Selway-Bitterroot Group) WI-20- Pacific Northwest Waterways Association WI-21- Southeastern Washington Sports Council WI-22- Lewiston-Clarkston Kiwanis...

South Coulee Dam--Zone I power tamping operations in cross-channels downstream from the cut-off wall, station 27+50
1947-07-09
Problem or Area of Concern Source Tentative Disposition PI-74 C F-14 PI-61 PI-67 12. (Cont) COMMENT: Considerations of reforestation and renovation of old forests to help maintain maximum land storage of water are included in the...

Scale model of Grand Coulee Dam
2024-05-16
Scaling at bottom of "Ice Dam" gorge.
1936-11-01
2024-05-16
Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor
1942-07-15
Bureau workmen Stretching bolts on scroll case in east powerhouse at Grand Coulee Dam, Left to right; Walt Scott and Robert Bush
1950-11-09
Source Tentative Disposition Problem or Area of Concern l. (Cont) E. Effect of peaking on passage at successive dams (Cont) 8. Effects of peaking on water quality (see II-C) - (Will there be subtle changes in water quality due to pool...

View of the propeller of the Miss Coulee displayed on a pedestal
1941-08-05
An unidentified man testing electrical.
1938-02-01
Test of form stripping. Re: stains on concrete
1940-03-02
Synchronized trucks handling huge, heavy section of steel roof girder, transporting it to the east powerhouse
1942-09-05
Method of suspending 1/2 of cooling barge for transportation
1941-06-25