Results

5426 - 5450 of 5942 Items    << < 213 214 215 216 217 218 219 220 221 222 > >> 
Thumbnail
Title
Description
Dates
East spillway, showing elevator shaft.
1941-06-30
Aim crosshairs for aligning drum gates.
1941-03-06
Director Oregon Wildlife Commission P.O. Box 3503 Portland, OR 97208 Director Fish Commission of Oregon 307 State Office Bldg. 1400 SW Fifth Ave. Portland, OR 97201 Director Dept. of Fisheries 115 General Administration Bldg....

Portland District (Cont'd) PI-69- A. B. Hughes PI-70- E. John Rumpakis PI-71- Mrs. Rolland M. Johnson PI-72- Dennis A. Larson PI-73- Mrs. Gayle A. Miller PI-74- Robert C. Peterson PI-75- Glenn S. Chambers PI-76- Norman F. Kujala...

Spillway Section--downstream face
1940-10-24
Walla Walla District (Cont'd) WI-18- Sierra Club (Palouse Group) WI-19- Sierra Club (Selway-Bitterroot Group) WI-20- Pacific Northwest Waterways Association WI-21- Southeastern Washington Sports Council WI-22- Lewiston-Clarkston Kiwanis...

South Coulee Dam--Zone I power tamping operations in cross-channels downstream from the cut-off wall, station 27+50
1947-07-09
Problem or Area of Concern Source Tentative Disposition PI-74 C F-14 PI-61 PI-67 12. (Cont) COMMENT: Considerations of reforestation and renovation of old forests to help maintain maximum land storage of water are included in the...

Scale model of Grand Coulee Dam
2024-05-15
Scaling at bottom of "Ice Dam" gorge.
1936-11-01
2024-05-15
Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor
1942-07-15
Bureau workmen Stretching bolts on scroll case in east powerhouse at Grand Coulee Dam, Left to right; Walt Scott and Robert Bush
1950-11-09
Source Tentative Disposition Problem or Area of Concern l. (Cont) E. Effect of peaking on passage at successive dams (Cont) 8. Effects of peaking on water quality (see II-C) - (Will there be subtle changes in water quality due to pool...

View of the propeller of the Miss Coulee displayed on a pedestal
1941-08-05
An unidentified man testing electrical.
1938-02-01
Test of form stripping. Re: stains on concrete
1940-03-02
Synchronized trucks handling huge, heavy section of steel roof girder, transporting it to the east powerhouse
1942-09-05
Method of suspending 1/2 of cooling barge for transportation
1941-06-25
Lubricating and insulating oils, received in tank cars, are stored in a lower section of the control bay. Tanks are provided for new and used oils of both kinds; and, oil can be pumped to or from any power unit. Oil pumping equipment, with air...
1941-09-10
Steam Hammer (3-1/2 foot-ton) driving interlocking steel piles in west cofferdam cell.
1936-08-01
2024-05-15
Source Tentative Disposition Problem or Area of Concern A F-5, 7 5.(Cont) COMMENT: a. As more thermal generation is added, there will come a time when the minimum hydro generation plus the thermal will exceed the hourly minimum load....

TABLE OF CONTENTS (Cont'd) Part Page SECTION 13: INDIAN NATIONS III-153 SECTION 14: OTHER A. Public Participation III-155 B. Coordination III-153 C. General Concerns III-161 IV PUBLIC MEETINGS AND WORKSHOPS IV-1...

Upper portion of Abernathy Creek showing burned off area which left erosion and destruction

Surface of vanes of turbine runner L-2. This view of the inner surface of the runner vanes shows where the paint has been eroded to bright metal along the trailing edge of the vanes. The bright surfaces had a sand blasted appearance as evidence of...
1942-07-13
5426 - 5450 of 5942 Items    << < 213 214 215 216 217 218 219 220 221 222 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press