Results

51 - 75 of 309 Items    << < 1 2 3 4 5 6 7 8 9 10 > >> 
Thumbnail
Title
Description
Dates
Report on hydrology of Owens Lake Basin and the natural soda industry as affected by the Los Angeles Aqueduct diversion. Oct. 1915.
2024-04-28
Item 338-339: Glaciers on North Fork of Big Pine Creek. Oct. 1, 1911
2024-04-28
Item 317a-317b: Owens Lake, from Cottonwood Power House Forebay

Refacing Hillside Dam
2024-04-28
Refacing Sabrina Dam
2024-04-28
Adams auxillary plant of the Southern Sierras Power Company in the Owens River Gorge.
2024-04-28
Photographs of the Inyo County area

Down Owens River Gorge from end of flow line of Adams Plant of the Southern Sierras Power Company.
2024-04-28
Owens River Gorge.
2024-04-28
Concrete measuring box on the farm of Wm. A. Trickey. Most of the flow shown here is drainage water.
2024-04-28
Intake of plant no. 4
2024-04-28
Plant 4, the Nevada California Power Company.
2024-04-28
Fourth lake of Brown & Hall on tributary entering south fork of Bishop Creek from the west.
2024-04-28
Outlet from pipeline of plant no. 6 for supplying Power's Ditch - 10 inch valve - discharge immediately below 13.95 sec. ft. (697.5 inches) as measured by C. H. Rhudy 8/1/18.
2024-04-28
Adams main flume. Showing break in upright caused by rock striking opposite end of cross members.

Adams main plant. Showing boulders which fell near by. This plant continued to operate after the quake and was shut down by W. J. Young when he arrived.

Adams main pipeline. Showing break in covering.

Nevada-California Power Company. Exciters and switchboards, powerhouse no.4.
2024-04-28
Refacing Sabrina Dam, practically completed September 1929.

Refacing of Hillside Dam, practically completed September 1930.

51 - 75 of 309 Items    << < 1 2 3 4 5 6 7 8 9 10 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press