Results

126 - 150 of 218 Items    << < 1 2 3 4 5 6 7 8 9 > >> 
Thumbnail
Title
Description
Dates
Needle valve being lowered to base in R-8 of East Powerhouse
1944-11-24
Man stands on the rotor--which nears completion
1941-07-05
One step in the assembly of rotor of Shasta generators to be used in west power house
1942-08-21
Workman using a micrometer on L-6 scroll case bolts after tightening.
1943-05-26
Wicket gates for L-8 turbine resting on generator deck. Mr. H.R. Ramm, U.S.B.R. cleaning and inspecting shafts
1947-06-28
Men install piping during early phase of construction.
1936-11-09
East side of Penstock liner. Man inside liner gives scale.
1940-01-10
View of a portion of the spillway section showing formwork and false work for construction of spillway bridge spans. The construction trestle appears below the formwork. Eight of the 102-inch outlet tubes are shown in use for diversion of the...
1941-08-21
View of the spillway section from the right bank
1941-03-03
Installation of main girders for drum gate
1940-12-05
Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber
1940-06-21
Riveting together the sections of the #1 Shasta turbine scroll case in pit 7. On the left is the heater. In the center, a man is bouncing a heated rivet to knock off the oxidized scale and on the right are the riveters waiting for the rivet.
1942-02-23
Scale model of Grand Coulee Dam
2024-11-21
Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor
1942-07-15
Reboring drum gate girder. Machine shop--powerhouse
1941-01-22
General view of excavation operations along bank
1936-11-01
Close up view of a dump truck dumping material during excavation operations.
2024-11-21
Close up view of unidentified equipment
1940-09-09
The two 14,000 h.p. station-service turbines at the left powerhouse are embedded in concrete to elevation 951, the generator floor level.
1940-08-01
General view of reinforcing steel at East Powerhouse base
1940-10-07
View of the spillway section from the left bank
1941-02-05
Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber
1940-06-20
Scale model of Grand Coulee Dam
2024-11-21
126 - 150 of 218 Items    << < 1 2 3 4 5 6 7 8 9 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press