Progress view of the stage of construction on the R-1 scroll case.
1948-08-17
|
View of the spillway section from the left bank
1941-03-31
|
Spillway Section--downstream face
1940-10-24
|
Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman.
1947-06-28
|
The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place.
1947-06-27
|
A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground
1942-11-28
|
air compressors in power house
1941-09-10
|
View of men breaking up rock for excavation operations.
2024-11-21
|
A 5-yard electric shovel, 10-yard dump buggy and 75 H.P. diesel Caterpillar used for excavating in the west side river diversion channel
1936-07-30
|
Progress photos of the East Powerhouse as of date.
1941-08-07
|
Hoisting elevator shaft form into place. 3 men riding load.
1941-06-30
|
Aim crosshairs for aligning drum gates.
1941-03-06
|
Concrete breaker used to tighten bolts on L-6 scroll case
1943-05-26
|
A centrifugal oil purifier, a filter, and automatic electric heater, and meter, pumps, gauges, pipes, and necessary appurtenances are mounted on a simple truck for use in various parts of the plant. The unit is designed to handle lubricating,...
1941-09-10
|
Newsletter: CAP Newsletter, vol. III, January, 1966, page 2
1966-01-01
|
Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia
1941-05-22
|
View of East Powerhouse and transformer deck with outlet tubes in background.
1942-04-28
|
South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west...
1948-09-02
|
East spillway, showing elevator shaft.
1941-06-30
|
View of the spillway section from the left bank
1941-03-03
|
Transition form for inlet to 57-inch supply pipe for drum gate control. One of these water supply inlets is in each pier for a total of 11. A 57"" butterfly valve will be connected to this inlet for control of water supply.
1940-06-12
|