Rendition of proposed John Day Lock and Dam. See photo 94-0 16 for description.
1962-11-22
|
Shown here is the town of Boardman on the left side of the picture, showing U.S. Highway 30 to the upper or south of the picture. At the lower left hand corner of the picture may be seen the Union Pacific Railroad right of way. The entire town of...
1965-11-22
|
Estimates of energy requirements for the development of the Pacific Northwest, along with proposed projects to meet those needs.
1960-11-22
|
Men install piping during early phase of construction.
1936-11-09
|
Distance view of the future site of Grand Coulee Dam. Excavation equipment may be seen in lower-left.
1934-04-03
|
Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. This aerial view of the Grand Coulee Dam area shows the status of progress on the construction of Grand Coulee pumping plant and feeder canal. The...
1949-09-21
|
Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Subcontractor: Consolidated Western Steel Corporation. Progress view of 12-foot diameter pump-discharge pipe emerging from P-4 tunnel. The two top...
1949-10-06
|
Residency No. 3, Specifications 2329, Unit R-3, Second Stage Concrete, Barrel Pour No. 9 to Elevation 977.0 and Pour No. 10 Elevation 978.87 Slab, Right Powerhouse. June 17, 1949. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons'...
1949-06-17
|
General view of reinforcing steel at East Powerhouse base
1940-10-07
|
South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west...
1948-09-02
|
East spillway, showing elevator shaft.
1941-06-30
|
Aim crosshairs for aligning drum gates.
1941-03-06
|
Spillway Section--downstream face
1940-10-24
|
South Coulee Dam--Zone I power tamping operations in cross-channels downstream from the cut-off wall, station 27+50
1947-07-09
|
Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor
1942-07-15
|
Bureau workmen Stretching bolts on scroll case in east powerhouse at Grand Coulee Dam, Left to right; Walt Scott and Robert Bush
1950-11-09
|
View of the propeller of the Miss Coulee displayed on a pedestal
1941-08-05
|
Test of form stripping. Re: stains on concrete
1940-03-02
|
Synchronized trucks handling huge, heavy section of steel roof girder, transporting it to the east powerhouse
1942-09-05
|
Method of suspending 1/2 of cooling barge for transportation
1941-06-25
|
Lubricating and insulating oils, received in tank cars, are stored in a lower section of the control bay. Tanks are provided for new and used oils of both kinds; and, oil can be pumped to or from any power unit. Oil pumping equipment, with air...
1941-09-10
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-05-23
|