Lowering tube for placement in outlet works at elevation 1137.
1940-01-02
Aerial view looking into the upper end of the 12 pumping plant discharge pipe tunnels. Just beyond the tunnel mouths is the pumping plant. The upper combined bends for discharge pipes Nos. 1 and 2 are in position at the bottom of the picture.
1949-06-15
Men and machines clean up debris from powerhouse area. Dam is in the background.
1941-12-29
Feeder Canal. Specs. 2586. J.A. Terteling and Sons Inc., Contractors. This photograph was taken on the extreme west end of the Electric City Storage Yard. The sub-contractor, the Steel Construction Co., who have the contract with J.A. Terteling...
1949-08-16
Bays 1-2 and 3 in East Powerhouse.
1942-02-23
Close up view of men working on eastern spillway arch.
1941-07-15
Men stand on girder during drum gate construction
1941-01-21
Aerial view of construction of Grand Coulee Dam
1940-06-03
Feeder Canal. This photograph was taken at about station 75+15 in the invert of the outlet open transition of the cut-and-cover looking east at the downstream end of the barrel section. The contractor is erecting forms, and placing reinforcing...
1950-05-26
Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman.
1947-06-28
The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place.
1947-06-27
Chinook migrants in dividing box near the end of Dryden Ditch
1940-07-14
Col. Basin Proj., Grand Coulee Dam.--Lowering the turbine runner for the No. 1 Shasta Dam generator, of 75,000 kw. Capacity, moved to Grand Coulee Dam with another machine of like size to expedite delivery of new power to Pacific Coast war...
1942-10-15
A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground
1942-11-28
A close up view of bolts in a concrete wall
1938-02-01
Sample core of Grant; showing seam
2024-11-22
Govt. inspector filling cylinder with concrete sample at a plant for compression braking test
1940-07-26
Gear system used in moving large crane on top of dam. These gears are connected to wheels resting on track that extends entirely across dam.
1942-05-22
Interior of caisson drydock showing rock that is being placed in bottom. Sand will be placed on top of rock and reinforced concrete atop the sand. The four piers form the resting place for the caisson
1944-11-29
View of eight thrust bearing discs for unit L-3. The discs are laying upside down to indicate worn spots in the centers where the jack screws had made contact. The depth of these holes varied from 0.005"" to 0.007"" Grand Coulee Power...
1945-10-22
Failure of L-3 Turbine. Note: deflector plates wedged between crown plate and runner looking east by south-east
1945-06-15
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-05-23
Power diversion, old mill, diversion return and fish-ladder at Cedar Creek dam and falls at Hall, Washington
Dam and falls only partly showing upstream
Fish-ladder leads into diversion
1937-08-06