2024-11-22
2024-11-22 |
2024-11-22
2024-11-22 |
2024-11-22
2024-11-22 |
Document: Water and the West by Senator Henry M. Jackson, November 5, 1965, page 7
1965-11-05
|
2024-11-22
2024-11-22 |
Letter: To Wayne N. Aspinall, from Anthoy Wayne Smith, September 14 1965, (mimeograph), page 6
1965-09-14
|
1 map ; negative, 18 x 34 cm. Gravity Project Area, Pumping Project Area, and Boundary of watershed above Albany Falls all marked by differentiated shading
Before the arrival to Washington State of the first irrigation projects handled by the...
2024-11-22
|
2024-11-22
2024-11-22 |
2024-11-22
2024-11-22 |
2024-11-22
2024-11-22 |
1 map : hand col. ; 72 x 91 cm. "Bowen & Co. lith, Philada." Relief shown by hachures and spot heights; depths by soundings and gradient tints. Shows four proposed boundaries between the United States and British Columbia introduced to resolve the...
1868-11-22
|
Rendition of proposed Asotin dam. For description, please see photo 94-0 39
1964-11-22
|
A map of authorized and potential projects to be undertaken by the Corps of Engineers.
1960-11-22
|
View of men breaking up rock for excavation operations.
2024-11-22
|
Panoramic view of the Grand Coulee site. Both banks are visible, as are excavation operations and employee housing.
1935-08-02
|
A 5-yard electric shovel and 10-yard buggies working in the diversion channel
1936-08-01
|
An aerial view looking northeast. A general view showing feeder canal, area above feeder canal, and part of town of Grand Coulee. Highest crack in slide area is visible. Feeder canal outline can be seen back to headworks. A view of the area above...
1947-10-21
|
Specifications 2329, Morrison-Knudsen So., Inc. and Peter Kiewit Sons' Company. Progress view showing initial construction on the pump discharge outlet structure. On the right can be seen the completed invert of P-1 and P-2 conduits with the...
1949-06-28
|
View of Grand Coulee from west bank. Cranes visible on bank.
1941-05-09
|
Terrazzo machine man applying linseed oil and turpentine to floor and base of Unit L-1, elevation 991, West Powerhouse. This oil is floated for at least six hours before being removed.
1949-03-25
|
View of East Powerhouse and transformer deck with outlet tubes in background.
1942-04-28
|
View of the dam with newly constructed observation building in the foreground
1941-07-04
|
Upstream view of the dam taken from Rattlesnake Peak
1941-04-25
|
Downstream photo of the spillway section at Grand Coulee Dam
1940-12-31
|