Columbia Basin Project, Irrigation Division, Specifications No. 1401, Long Lake Dam, Contractor: J.A. Terteling and Sons, Inc. A view of the completed dam from the east abutment. Long Lake Dam is 2 miles northeast of Stratford, Wa. Harold Foss,...
1949-10-11
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1935-09-26
|
One-man gill net boat with power roller and two man stern picker boat
1937-07-31
2003-01-01 |
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1937-06-30
2003-01-01 |
Trucking net from blue-stone tank to racks near Ilwaco, Washington
1937-08-14
2003-01-01 |
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, plate 1
1963-10-01
|
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 21
1963-10-01
|
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, frontispiece
1963-10-01
|
Columbia Basin Project--Irrigation division. Majestic joint filler being placed in transverse joint during lining operations on West Canal. Majestic joint filler and white pigmented curing compound application is handled from this jumbo which...
1948-04-22
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411, Utah Construction Company and Winston Bros. Co., Contractor. This photograph of two 2-inch I.R. insert bits. The one on the left is new. The one on the right has...
1949-05-10
|
Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43"" Class ""D"" pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of...
1950-11-08
|
South Coulee Dam--Embankment placing operations, stations 33+50 to 34+50, approximate elevation 1499. Closeup of standard and narrow-drum rollers, showing effect of cleaners. Approximate needle moisture reading of 2700
1947-06-26
|
West Canal, Specs. 1286, Winston-Utah Co. Hoppers and discharge pipes for concrete in Guntert and Zimmerman paver. Shuttle car is visible in the upper right corner.
1948-04-07
|
West Canal, Specs. 1286, Winston-Utah Co. Guntert and Zimmerman lining machine in operation. At the right are the two tractor-propelled mixers which serve the paver. A truck is dumping aggregates and cement in the hopper of the mixer. Photo by...
1950-04-07
|
Closeup of Guntert and Zimmerman trimmer being used by Winston-Utah on East Low Canal. Photograph taken especially for Popular Mechanics Magazine. Photographer: F. B. Pomeroy
1949-08-30
|
View shows progress of P-1-Second Stage Phase two. Suction elbow installation to date. Contract 12r-18156. Contractors-Morrison Knudsen Company Inc. and Peter Kiewit Sons-Grand Coulee Dam, Columbia Basin Project.
1950-09-27
|
Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing size of fractures in stratified material in test pit at Station 499+00. Bottom margin of photo is approximately elev. 1027. View inclines upward along corner behind...
1948-09-02
|
Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Outlet works tunnel taken from outlet portal. Long lake Dam is two miles northeast of Stratford, Wash. A.W. Bauman, photographer
1947-06-09
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This comparison photograph shows a man standing on the right side of lined section 79A. The direction of flow through the siphon is from left to right of the picture. Work...
1950-06-09
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co. and Winston Bros. Co., Contractor. Looking east along the west canal showing Dry Coulee Siphon No. 2 in the foreground, the section of 12-foot...
1949-05-25
|
Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Looking northeasterly over Crab Creek Siphon No. 1. Bifurcation works junction of Main, West, and East...
1943-08-30
|
Master scanned with Epson 1640XL at 800 dpi. Image manipulated with Adobe Photoshop 7.0.
1939-05-31
|
Columbia Basin Project--Irrigation Division--Main Canal--Western Contracting Corp., contractor--Specifications No. 2324. This view is intended to show the transparent plastic hose used on the discharge side of the AEA pump. The plastic hose gives...
1949-06-21
|