Browse by Archive
Sabrina Dam. A portion of the downstream rock face of the dam showing how this dam is fitted over sereral rock points throughout its length. Photo State Department Public works
|
Refacing Sabrina Dam, practically completed September 1929.
|
Nevada-California Power Company. Excite Units and switchboard, no.2 powerhouse.
2024-12-11
|
Nevada-California Power Company. Governor side of powerhouse no. 2.
2024-12-11
|
Nevada-California Power Company. Interior of powerhouse no. 2.
2024-12-11
|
Nevada-California Power Company. No. 2 plant, transformer house and measuring weir.
2024-12-11
|
Nevada-California Power Company. Switchboard, powerhouse no.2
2024-12-11
|
Nevada-California Power Company. Switchboards and transformers, powerhouse no.4.
2024-12-11
|
Nevada-California Power Company. Powerhouse no.4, switch house, lightening aresster compartment and intake of conduit no.5.
2024-12-11
|
Nevada-California Power Company. Exciters and switchboards, powerhouse no.4.
2024-12-11
|
Nevada-California Power Company. General interior, powerhouse no.4
2024-12-11
|
Nevada-California Power Company. No.2 plant, transformer house, measuring weir and pressure line.
|
Nevada-California Power Company. Interior of transformer house.
2024-12-11
|
Adams auxillary intake. Showing break in steel pipe at outlet of intake.
|