Browse by Archive

University of Idaho Digital Collections

View Archive Info

Bulldozer Jockeys have a special technique for flood fighting. It is a double action procedure of moving their equipment out into the flood stream bed and with the bulldozer blade widening the stream channel, at the same time pushing the blade...
1964-04-19
Bulldozer operating midstream on the Grande Ronde River upstream from La Grande, Oregon, in restoration effort of re-establishing river channel and shoring up the eroded embankments caused by the late January flood.
1965-04-19
For artists rendition of the dam, please see photo 94-0 33
1965-04-19
For description of the project, please see photo 94-0 32.
1964-04-19
In addition to a fleet of trucks, the Guy F. Atkinson Company of San Francisco, California, holder of the first stage construction contract at the U.S. Army, Corps of Engineers' Little Goose Lock and Dam site, has assigned two work barges with...
1965-04-19
For description of the project, please see photo 94-0 35
1964-04-19
Map shows approx. Hells Canyon to Walla Walla and dams in between.
1960-04-19
Artists rendition of Snake River area, including proposed Asotin Dam.
1965-04-19
Description of proposed Asotin Dam, for artists rendition, please see photo 94-0 40
1965-04-19
Rendition of proposed Asotin dam. For description, please see photo 94-0 39
1964-04-19
"Cat jockeys" must know their stuff in preparing the tunnel portal at the U.S. Army Corps of Engineers' Dworshak Dam on the North Fork of the Clearwater River. Here the two Bulldozers push over the cliff the results of a fair-sized blast at the...
1965-04-19
Fifty-foot high, four decked jumbo drill rig that will be used to bore the diversion tunnel at the U.S. Army Corps of Engineers' Dworshak Dam on the North For Clearwater River. Thirty air-driven "Swedish ladder drills" will be distributed along...
1965-04-19
Clearing timber from the land at the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam site on the North Fork of the Clearwater River is well underway. Dworshak Dam will set across the river about the center of the picture and will climb to...
1964-04-19
Clearing crews are hard at the task of removing timber from the shore line at the site of the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam three miles upstream from the town of Ahsahka, near the confluence of the North Fork of the...
1964-04-19
Description of proposed John Day Lock and Dam. See photo 94-0 17 for artist's rendition.
1962-04-19
Rendition of proposed John Day Lock and Dam. See photo 94-0 16 for description.
1962-04-19
Looking downstream on the Columbia River, with Mount Hood in the background, is the U.S. Army Corps of Engineers John Day Lock and Dam. Work on the South or left shore, being carried on behind the 25-acre cofferdam enclosed work area, is nearing...
1965-04-19
Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia
1941-05-22
Coulee dam and vicinity from Crown Point
1950-05-02
Columbia Basin Project, Irrigation Division. Othello Government Housing, Specifications No. R1-CB-30. View looking west along county road continuous with Main Street of Othello, Wash., Showing three three-bedroom and seven two-bedroom permanent...
1950-04-28
Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream at approximate station 2015.00 at caterpillar dozer with one tooth ripper doing rough excavation for chute. Winnin and...
1950-04-04
Columbia Basin Project, Irrigation Division. This is a montage showing various stages in the construction of the West and East low canals. From the upper left proceeding clockwise: sloping; tamping; paving, West Canal; spraying, paving, East Low...
1949-03-17
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Utah Construction Company and Winston Bros. Co., Contractor. This view of the Schedule II excavation looking downstream from station 465/50/, shows the 1"" sq....
1949-09-08
Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 2. View looking northwesterly into ditch being excavated for W 645 drain culvert under third section of the West Canal at station 1632.25. The...
1950-04-04
Columbia Basin Project, Irrigation Division I, Main Canal, Specifications 1236, J. A. Terteling and Sons, Inc., Contractors. Main canal looking upstream from sta. 33/00. Monighan dragline building up right bank with borrow material prior to pacing...
1948-05-04
326 - 350 of 1668 Items    << < 9 10 11 12 13 14 15 16 17 18 > >> 

© Western Waters Digital Library - GWLA member projects - Designed by the J. Willard Marriott Library - Hosted by Oregon State University Libraries and Press