South Coulee Dam--Grouting foundation drainage system, stations 26+50 to 29+25, approximate elevation 1512. Risers are located along the side slopes of the cut-off trench.
1947-07-23
Installation of main girders for drum gate
1940-12-05
Men work on drum gate number one
1940-12-07
Downstream photo of the spillway section at Grand Coulee Dam
1940-12-31
Men stand on girder during drum gate construction
1941-01-21
Riveting and welding face plates on drum gate #1
1941-01-28
View of the spillway section from the left bank
1941-02-05
View of the spillway section from the right bank
1941-03-03
View of the spillway section from the left bank
1941-03-03
Aim crosshairs for aligning drum gates.
1941-03-06
View of the spillway section from the left bank
1941-03-31
Upstream view of the dam taken from Rattlesnake Peak
1941-04-25
Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Looking west at west abutment showing cut-off wall and rock fracture at Station 8+00. Long Lake Dam is two miles northeast of Stratford,...
1947-10-01
View of the spillway section of Grand Coulee taken from the right bank.
1941-05-05
Telephoto view of drumgates near base of the dam.
1941-05-22
View of the outlet works near the base of the dam. A man is standing in foreground for scale.
1941-06-26
East spillway, showing elevator shaft.
1941-06-30
Hoisting elevator shaft form into place. 3 men riding load.
1941-06-30
View of the dam with newly constructed observation building in the foreground
1941-07-04
Close up view of men working on eastern spillway arch.
1941-07-15
View of all of the spillway arches.
1941-07-31