Dry Coulee Siphon No. 1. --This over-all photograph shows the cycle in placing concrete in Dry Coulee Siphon No. 1 by Winston-Utah. Nearest the camera is the first pour of concrete with the outside form removed and the inside form still in place....
1947-07-17
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, of the horizontal curve, P.I. Station 468+54.95. In the foreground...
1949-10-05
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros. Co., Contractor. This longitudinal view shows the outer curtain of re-steel. The liner curtain and ""liner"" support...
1949-06-27
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon. Lowering a "can" for placement in the steel-lined section of the Siphon (Schedule II).
1949-07-01
|
Crab Creek siphon. Photo shows workmen covering siphon in background and pouring the elbow in the foreground
1948-10-08
|
Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position
1943-03-23
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co. and Winston Bros. Co., Contractor. Looking east along the west canal showing Dry Coulee Siphon No. 2 in the foreground, the section of 12-foot...
1949-05-25
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specifications No. 2603. Job fabricated wood burning hot water heating plant set up at jobsite in preparation for cold weather control of concrete temperatures. Water is...
1950-10-02
|
This view shows the sand blasting operations on the exterior surface of the exposed section of the pumping plant discharge pipe #1 in preparation for painting the exterior surface. This work is being performed by Machinist, Inc., subcontractor of...
1950-06-02
|
Feeder Canal. This photograph was taken at about station 75+15 in the invert of the outlet open transition of the cut-and-cover looking east at the downstream end of the barrel section. The contractor is erecting forms, and placing reinforcing...
1950-05-26
|
Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Forming floor screeds in closed outlet Broken Rock Siphon #2. Floor concrete placed first; screeds outline construction joint. H.E. Foss, photographer
1950-09-14
|
Columbia Basin Project, Irrigation Division, East Low Canal, Specifications 1422, Utah Construction Co. and Winston Bros., Contractor. Looking east across the Broken Rock Siphon No. 1 showing the completed barrel section and construction of the...
1949-08-04
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph from Station 382+, looking downstream, shows the completed gravel trap and open inlet transition. The gravel trap baffles and their drains are clearly...
1950-06-21
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros., Contractor. This photograph shows a "liner plate" about three quarters rolled. H.E. Foss, photographer
1949-06-27
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This comparison photograph shows a man standing on the right side of lined section 79A. The direction of flow through the siphon is from left to right of the picture. Work...
1950-06-09
|
Columbia Basin Project, Irrigation Division, Specifications No. 2844. Third Section, West Canal, Schedule No. 1 and 2--Contractor: Marshall, Haas, and Royce, Haas and Rothschild--View showing outlet or downstream end of drainage culvert at Station...
1950-07-11
|
Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, shows the Schedule II siphon concrete placed to date. Dark concrete...
1949-10-16
|
Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at Sta....
1949-10-17
|
Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral Turnout at Sta....
1949-10-17
|
Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at 1059+54...
1949-10-17
|
Men appear to be playing a game while on break.
1941-01-21
|
Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking easterly over completed portion of Dry Coulee Siphon No. 1 from Section 172. Steel yard, where...
1948-09-15
|
Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Outlet works tunnel taken from outlet portal. Long lake Dam is two miles northeast of Stratford, Wash. A.W. Bauman, photographer
1947-06-09
|
Columbia Basin Project, Irrigation Division I. Bacon Tunnel, Specifications 1236, T.E. Conolly Inc., Contractor. Inlet portal of the Bacon Tunnel showing the full size of tunnel and steel supports in position
1947-07-23
|
Columbia Basin Project, Irrigation Division I, Bacon Tunnel, Specification 1236, T.E. Connolly Inc., Contractors. Photograph toward tunnel portal from Station 186+44, showing both unsupported and timbered tunnel from Station186+50 and Station 187+10.
1947-03-13
|