Browse by Archive
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: Five Room Residence Type 8 Plans and Details
1905-04-18
2024-11-25 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: Court Type Houses- C-2 - General Plans and Sections
1905-04-18
2024-11-25 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: North Dormitory South and West Elevations
1934-11-15
2024-11-25 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: North Dormitory North and East Elevations
1934-11-15
2024-11-25 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: South Dormitory Floor Plans
1934-11-15
2024-11-25 |
Department of the Interior: Bureau of Reclamation Columbia Basin Project - Washington: Grand Coulee Dam-Government Camp: North Dormitory Floor Plans
1934-11-15
2024-11-25 |
Contractor's catwalk, later replaced by one slightly farther downstream.
1935-01-30
2024-11-25 |
Excavation for copper cable grounding mat on west tailrace slope
1935-11-08
2024-11-25 |
Catwalk across Columbia River about 1000 feet below dam site. Part of Government Camp in the Distance.
1935-06-21
2024-11-25 |
Wooden trestle across Columbia River at Grand Coulee in an ice flow.
1935-01-22
2024-11-25 |
Contractor's Recreation Hall housing pool and card tables, beer bar, lunch counter, stage company's office, barber shop, and shoe repair shop.
1935-03-02
2024-11-25 |
The two camps at the dam site. In the foreground is the "Coulee Dam" the Government Camp; and across the river is "Mason City" the contractor's camp.
1936-08-26
2024-11-25 |
Plan of River Diversion. Grand Coulee Dam. Columbia Basin Project Washington
1905-04-19
2024-11-25 |
Corner of a timber crib for cross river cofferdam - 12 x 12 inch fir.
1936-05-01
2024-11-25 |
Sounding barge for taking elevations of river bottom for fitting timber cofferdam cribs in river channel ; 52,000 soundings taken.
1936-07-01
2024-11-25 |
Building one of nine barges for work on river diversion and dam construction.
1936-08-01
2024-11-25 |
East end of upstream cross-river cofferdam - one arch of steel piling in place. Across river is main sections of west cofferdam.
1936-08-01
2024-11-25 |
Building cribs for upstream cross-river cofferdam. On left is arch form for steel pile facing.
1936-08-01
2024-11-25 |