Bedrock on West Side.
1935-09-26
2024-11-25
Excavation on the west side. Trestle and catwalk in the distance.
1935-01-30
2024-11-25
Excavation activities, including conveyors, in south-east section of area enclosed by the west cofferdam.
1935-03-20
2024-11-25
Athey 10-yard buggy and Caterpillar bulldozer feeding a tributary conveyor feeder.
1935-03-21
2024-11-25
Rebuilt 25-yard Woolridge buggy 16 wheels, and Caterpillar 75 tractor, working on the west side
1935-01-03
2024-11-25
Seventy-five ton trailer truck moving a 300 horsepower boiler.
1935-05-27
2024-11-25
Five-yard shovel loading a 15-yard buggy in west tailrace area.
1935-06-24
2024-11-25
Excavation behind southeast corner of west cofferdam. Cross-river excavation trestle in operation.
1935-08-28
2024-11-25
Excavation equipment on the east side.
1935-08-01
2024-11-25
Excavation behind west cofferdam and erection of central tower for aggregate conveyor suspension bridge to westmix.
1935-09-02
2024-11-25
A 60-inch underground feeder for tributary conveyors in transportation of spoil from west side excavation.
1935-04-24
2024-11-25
A 25-yard rebuilt Woolridge buggy ready to dump on grizzly of tributary conveyor feeder.
1935-03-21
2024-11-25
Grand Coulee Dam-Excavation Conveyor System

2024-11-25
Train of two Athey 10-yard buggies and Caterpillar tractor feeding a tributary conveyor feeder.
1935-03-21
2024-11-25
Upper end of 60-inch spoil conveyor, showing discharge to dump in Rattle Snake Canyon.
1935-09-20
2024-11-25
Extensible section of the 60-inch excavation conveyor.
1935-05-01
2024-11-25
Conveyor stacker discharging to spoil pile in Rattlesnake Canyon - maximum rate about one ton per second.
1935-09-19
2024-11-25
Stacker unit of 60-inch excavation conveyor - capacity 60,000 cubic yards per day.
1935-03-18
2024-11-25
Slip of excavated material in Rattlesnake spoil pile, damaging stacker unit of conveyor system.
1935-03-30
2024-11-25
Rattlesnake Canyon, one mile from dam site - site for spoil pile of west excavation material.
1935-01-01
2024-11-25
A branch of excavation spoil pile in Rattlesnake Canyon at water edge, in Columbia River.
1935-09-01
2024-11-25
A recurring earth movement in west slide area.
1935-08-02
2024-11-25
Five-yard electric shovel handling rock near west abutment.
1935-05-20
2024-11-25
First bedrock exposed in excavation on west side, along tailrace.
1935-07-24
2024-11-25
Lift seam in west excavation area.
1935-09-27
2024-11-25