Browse by Archive
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp Three Room Residence Type 3 Elevations
1934-05-29
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Plot Plan
1934-08-06
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Exterior Elevations
1934-08-06
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Grade School Floor and Roof Plans
1934-08-06
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Columbia River Highway Bridge General Plan and Elevation
1934-07-10
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Water System General Plan
1934-03-13
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Water System Storage Reservoir and Chlorination Plant
1934-02-07
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Sanitary Sewer Layout
1934-03-26
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam - Organization Chart May 1934
1934-05-01
2024-11-25 |
Grand Coulee Dam Plan of West Cofferdam 1934
1935-04-17
2024-11-25 |
Future site of the Grand Coulee Dam - looking upstream. Excavation Contractor Ryan's camp in the foreground.
1934-01-04
2024-11-25 |
Consulting Board: left to right - D.C. Henny; Dr. C.P. Berkey;;(J.L. Savage, U.S.B.R. Chas. H. Paul, Chairman; Joseph Jacobs; Dr. W.F. Durand;;(Frank A. Banks, U.S.B.R.
1934-01-01
2024-11-25 |
Triangulation Station - Keller Mountain.
1934-06-01
2024-11-25 |
Pile Trestle Bridge - looking east, 1/4 mile below axis of dam
1934-11-02
2024-11-25 |
Site of Government Camp in foreground. North portion of contractor's camp across the river - air-port in the distance.
1934-06-27
2024-11-25 |
Diamond core drilling rigs set at the Grand Coulee Dam site.
1934-03-02
2024-11-25 |
Slide of two million cubic yards, at west end of dam axis. Elevation at top of escarpment approximately 1600 feet- Ryan excavation contract
1934-04-03
2024-11-25 |
Photograph of west bank were landslide occurred in April 1934
1933-04-03
2024-11-25 |
Cells completed after ten days' work on west cofferdam
1935-01-10
2024-11-25 |