Browse by Archive
South end of Government Camp in foreground. East abutment excavation across the river.
1934-12-02
2024-11-25 |
Stiff-leg derricks in place on timber cribs for constructing the 3,000 foot cellular steel piling cofferdam on west side of river.
1934-12-28
2024-11-25 |
Preparing to build east pier for highway bridge below dam site.
1934-05-24
2024-11-25 |
Bedrock under east pier of highway bridge
1934-11-01
2024-11-25 |
Preparing to build east pier for highway bridge below dam site.
1935-05-24
2024-11-25 |
Site of government camp-delta at mouth of Fiddle Creek
1934-04-03
2024-11-25 |
Mason City town site (contractor's camp); Government Camp in foreground
1935-10-01
2024-11-25 |
Government Camp in the foreground. South end of contractor's camp across the river.
1934-10-05
2024-11-25 |
Looking west, Government Camp across the river.
1934-12-01
2024-11-25 |
Utility reservoir, Government Camp. Mason City (Contractor's Camp) in the distance.
1934-12-01
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Columbia River Dam Excavation Plan and Sections Schedule No. 2
1933-10-18
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Columbia River Dam Excavation Plan and Sections Schedule No. 2
1933-10-18
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Grand Coulee Dam U.S. Construction Railroad Alignment - Mile 0 to Mile 15
1934-04-18
2024-11-25 |
United States Department of the Interior. Bureau of Reclamation. Columbia Basin Project - Washington. Grand Coulee Dam Spillway - Maximum Section. Drawn: C.A.M.25109; Denver, Colo. April 16, 1934. 222-D-309.
1934-04-19
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Grand Coulee Dam Area, Capacity, and Discharge Curves
1934-04-16
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project--Washington. Grand Coulee Power Plant General Plan
1934-04-16
2024-11-25 |
Department of the Interior. Bureau of Reclamation. Columbia Basin Project - Washington. Grand Coulee Power Plant. Longitudinal Sections. Drawn: A.T; 25134. Denver, Colorado. 16 April 1934; 222-D-334.
1934-04-16
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Transverse Sections
1934-04-16
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 1 Floor Plan & Sections
1934-05-29
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 1 Elevations
1934-05-29
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 2 Floor Plans & Sections
1934-05-29
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 2 Elevations
1934-05-29
2024-11-25 |
Department of the Interior: Bureau of Reclamation; Columbia Basin Project-Washington Grand Coulee Dam Government Camp - Three Room Residence Type 3 Floor Plans & Sections
1934-05-29
2024-11-25 |