Browse by Archive
Source WI-70
WI-70 SI-54, 75 PI-21 W-6
F C
PI-60
Tentative Disposition
SI-62 SI-70
Problem or Area of Concern
1. (Cont) Build at least two orchards of not less than 25 acres each in the Wawawai, Almota, and Penawawa area to partly...
|
Source WI-67
SI-19 WI-13, 70 W-6
Tentative Disposition
C C
WI-1 A
Problem or Area of Concern
4. Replacement of the quality goose hunting on Lower Snake River. Replace or relocate gravel bars, islands and brush.
5. Studies should...
|
Source
PI-50 WI-70
WI-73 F-16
Tentative 1/ Disposition
A A
WI-70 C F-9, 14
Problem or Area of Concern
A. System-Project Operational Effects
1. If shoreline becomes a mud bank at low pool, it detracts from reservoirs' public...
|
Source
SI-26, 31, 38 PI-41
F-7
Tentative Disposition
E
SI-19, 26 F W-6
PI-10,5 F
Problem or Area of Concern
2. We should investigate architectural and landscaping alternatives to enhance appearance of levees, dams,...
|
Source 0-4
0-4 0-4 0-4
Tentative Disposition
F F F B
Problem or Area of Concern
5. There will be a need for prior removal of vegetation in the shore inundation zone or that which dies due to daily water level fluctuations.
6....
|
Source WI-71
WI-18, 35 PI-50 PI-21
Tentative Disposition
WI-1, 4, 16, 68 F SI-44
PI-4, 17, 21, 50
F A
Problem or Area of Concern
9. Need to maintain good cultural practices on the land to enhance the quality of human life.
10....
|
Tentative Disposition
D
Source
SI-25, 32, 35, 38, 43, 44, 45
46, 55, 60, 66
WI-1, 13, 33, 35, 49
PI-2, 9, 19, 21, 25, 34, 37,
47, 50
PI-57
Problem or Area of Concern C. New Programs and Enhancement Measures
1. A plan and...
|
Source
Tentative Disposition
WI-3 E F-19
F-6, 19 F PI-4, 17, 21, 32, 50
SI-20, 33, 38, 44
W-1
WI-25, 43, 47, 49, 70
Problem or Area of Concern
1. (Cont) COMMENT: Considerable interest was expressed at public meetings and...
|
Source PI-112
WI-53
PI-50, 53 W-6
F-19
Tentative Disposition
F E
PI-51 F-19
WI-70 F-19
PI-50, 87, 101 F-19
D F
F
Problem or Area of Concern
4. Any policies or judgments involved in the use of land should be subjected...
|
Source
Tentative Disposition
SI-1, 19, 22, 23, 26, 27 C WI-1, 13, 20, 29, 30
PI-19, 20, 21, 44, 50
W-6
F-16, 19
SI-1, 5, 25, 29, 31, 37, 39, A 42, 50, 52, 54, 56, 58, 59
WI-1, 3, 13, 14, 30, 31, 36,
38, 40, 45, 46, 51
PI-20, 21,...
|
Source
Tentative Disposition
WI-55
PI-49, 50 F-14
A E
Problem or Area of Concern
10. (Cont) COMMENT: Detailed study of alternatives for this river reach is needed and will be made as part of the CR&T study in cooperation with the...
|
Problem or Area of Concern Source
Tentative Disposition
PI-74 C F-14
PI-61 PI-67
12. (Cont) COMMENT: Considerations of reforestation and renovation of old forests to help maintain maximum land storage of water are included in the...
|
Source
Tentative Disposition
PI-21, 41, 50, 65, 66 B
Problem or Area of Concern
13. (Cont) COMMENT: stream water quality and prevention of stream sedimentation and debris include: preventing the falling and yarding of timber across live...
|
Source
WI-70, 72 WI-68
PI-22, 78 ST-74
E
F F
PI-96, 102 F-15
Tentative Disposition
C
Problem or Area of Concern
15. A management plan for rock aggregate should be developed for the mid-Columbia area. Supplies should be...
|
Source
WI-6, 7, 8, 13, 14, 15, 17, 18, 19, 21, 23, 26, 29, 34, 35, 39, 50, 70
SI-74
Tentative Disposition
E
PI-2, 50, 51, 56 F
E
Problem or Area of Concern
3. Build no more dams without comprehensive study and approval of...
|
Tentative Disposition
E
WI-7, 8, 9, 10, 22, 52, 53 F
F-2, W-6 WI-73
F-3, W-6 F SI-1, 2, 5, 11, 19, 25, 29,
39, 45, 46, 49, 50, 52,
74, 77
WI-3, 13, 15, 17, 28, 31, 32
34, 35, 36, 37, 40, 42, 46,
51, 57, 73
PI-20, 21, 50, 60,...
|
Source
Tentative Disposition
PI-105 WI-70 WI-70
WI-39 SI-82
F F F
F F
Problem or Area of Concern
9. (Cont) COMMENT: Construction of Lower Granite Dam has continued in light of energy needs of the region and nation and the fact...
|
Source
F-1
PI-21, 35, 39, 50, 60, 73 WI-2, 17, 20, 36, 37, 42, 56 SI-33, 63, 71
PI-95
Tentative—Disposition
F
Problem or Area of Concern A. Diversion
1. It has been proposed to divert massive quantities of water from the...
|
Source
Tentative Disposition
F
WI-69 C
PI-39 D F-19
SI-11, 19, 35 PI-21, 24, 35, 36
Problem or Area of Concern
2. At some locations in the Columbia River and tributaries F-7, 11 region, it may be desirable to transfer subbasin...
|
Source
Tentative Disposition SI-55 B
Problem or Area of Concern
4. (Cont) quality to fish hatcheries to ownership of submerged lands on streams declared navigable. Water commitments need to be sorted out so that flow requirements may be...
|
Source F-7
Tentative Disposition
B F-4, 9 C WI-1
PI-22 F
PI-22 F
Problem or Area of Concern B. Low Flow Augmentation
1. Include low flow augmentation as a project purpose in the Willamette River and other projects. Fishery...
|
Source PI-13, 21, 50
Tentative Disposition
A PI-19, 21, 50 A W-6
0-3, 4
WI-70
Problem or Area of Concern
A. Operational Impacts and Needed Improvements
1. Active slides exist along the Columbia-Snake River system. Depending on...
|
Source
Tentative Disposition W-4 A PI-1, 11, 20, 50, 90, 100
WI-66 B
F-4 B PI-1, 11, 50
Problem or Area of Concern
2. (Cont) COMMENT: CR&T Operational Impact Studies are establishing potential problem areas of this nature. Conditions...
|
Source
Tentative Disposition
F-7 B
PI-58 B
WI-30, 47, 48 E
Problem or Area of Concern
3. (Cont) COMMENT: This concern is relevant to a number of problem areas called to attention of the Corps and to the Congress on a nation-wide...
|
Source
W-5 F-9
Tentative Disposition
E
WI-74 E F-9
WI-71 F F-9
Problem or Area of Concern
C. Sediment Loads and Off-Stream Erosion Problems
1. More studies should be made of sediment loads and where it is entering rivers and...
|