7. Develop a park on flood plain of downtown Pullman. (G.B. 47)
COMMENT: A study of the Pullman flood problem is underway to determine if an authorized flood control...
|
Problem or Area of Concern
Source
SI-4, 22
PI-42
WI-20, 24, 26, 69 I-2
Tentative l/ Disposition
A
WI-2, 56 A PI-24, 30, 43, 71
A. Review of System Operation for Navigation
1. Existing and proposed river operation should be...
|
Problem or Area of Concern
Source
Tentative Disposition
WI-2, 20 A F-7
l.(Cont) currents into the lock approaches. Snake River traffic is restricted by the railroad bridge in the Wallula area. Other adverse conditions exist at McNary,...
|
Source
SI-41 WI-41
PI-14, 23, 30, 31, 33, 47
Tentative Disposition
F
PI-60, 66 C
PI-58 E
Problem or Area of Concern
3. In navigation studies, consider the relationship and implications of regional superport developments or...
|
Source
WI-20, 56, 69
PI-84, 88
PI-86, 90, 91, 104
PI-85, 104 PI-97
Tentative Disposition
A
Problem or Area of Concern C. Alternative Development Measures
1. Inclusion of a new lock should be a part of any Bonneville development....
|
Problem or Area of Concern
Source
W-6 A
WI-2, 13, 20, 31, 32, 39, 40, 45,
53, 54, 69
SI-25, 26, 32, 35, 37, 40, 41, 57
58, 59, 76
PI-13, 21, 23, 36, 42, 47, 98
Tentative Disposition
1.(Cont) tug per lockage. Users of the...
|
Problem or Area of Concern Source PI-30 B PI-19, 60
F-7 B PI-21, 50
Tentative Disposition
2.(Cont) through the CR&T study on the range of alternative uses identified by the public and the cost and benefits of each. Through active public...
|
Problem or Area of Concern
Source
PI-60, 96 E F-18
Tentative Disposition
PI-98
4.(Cont) available below Portland, from the mouth of the Columbia to Portland. Proper investigation, also, undoubtedly would turn up an adequate source of...
|
Problem or Area of Concern Source F-7 C
PI-22 F
B
PI-22
Tentative Disposition
5.(Cont) The charts show navigational hazards, aids to navigation, etc. They are maintained up to date through publication of weekly Notice to Mariners issued...
|
Problem or Area of Concern
Source SI-26, 19 B
WI-18, 20, 28
PI-3, 19, 21, 30, 38, 41, 46, 50
F-7 W-6
Tentative Disposition
8.(Cont) COMMENT: A proposal for constructing a waterway between the Columbia River and Puget Sound by way of...
|
Problem or Area of Concern Source SI-71 F
F-7 F
PI-62 F
Tentative Disposition
l.(Cont) COMMENT: A national dredge spoil research program was established by Congress in 1971 and is administered by the Corps of Engineers. Also, the Corps is...
|
Source PI-21
PI-21, 77 PI-60 PI-112 PI-53
Tentative Disposition
F F F
F F
Problem or Area of Concern
5. Sand dredged from the lower Columbia should not be used entirely for beach construction along the river. A solid beach from the...
|
Problem or Area of Concern
Source PI-77
PI-60
Tentative Disposition
F C B
F-7
10. Already, too many sloughs, etc., have been filled in.
11. The Port of Astoria should locate additional dockage and get active in locating spoil...
|
Problem or Area of Concern
Source
WI-9, 34, 60 SI-74
SI-76 PI-59 SI-76
Tentative Disposition
EE. Regulatory Alternatives
1. Users should pay for use of navigation facilities. (G.B. 27)
Navigation companies should share the...
|
Source
F- 7
PI-83, 106, 107
WI-55 SI-74 F-12
Tentative Disposition
F C
Problem or Area of Concern
2. Under certain conditions, restrictions on speed of ships and barges are necessary for reasons of public safety and erosion of...
|
Source
F-7, 19
PI-27, 29, 39, 47 WI-1, 2, 41, 69 W-3, 40, 53, 57 SI-33 F-7 A SI-33
F-19
Tentative 1/ Disposition
E
Problem or Area of Concern A. System Problems
1. Investigate projections of future irrigation depletions and...
|
Source WI-69 WI-69 I-2 F-11
C
C
WI-61 F-11
Tentative Disposition
A
Problem or Area of Concern
3. Study withdrawals from Lower Snake and Columbia Rivers.
COMMENT: Corps is studying in connection with issuance of permits for...
|
Source
SI-69 SI-33 WI-20, 56 PI-47 F-11, 19
E
C
SI-71 F-11F-11, 19
Tentative Disposition
C
Problem or Area of Concern B. Specific Irrigation Problems
1. Dry-farmed agriculture seems to require a large amount of fuel (gasoline...
|
Source
PI-27, 29, 48, 71, 95 F-11
WI-58
C
SI-77 F-11
Tentative Disposition
E
Problem or Area of Concern
4. The water table in the Odessa and Spokane vicinity has been dropping. What about the possibility of recharging these...
|
Problem or Area of Concern PI-21 F-11, 19
Source
SI-33, 50 I-2
W-6
F-9, 19
Tentative Disposition
C C
C. Policy Problems, Programs, etc.
1. Investigate new means of supplying water to crops. Conserve water by reuse. Investigate need...
|
Source
SI-19, 33 F-11, 19
SI-74 F-11
SI-74 F-11 SI-17 W-6 PI-21 F-11, 19
D
Tentative Disposition
F F F
Problem or Area of Concern
3. Study the possibility of using effluent from secondary treatment plants for agriculture...
|
Problem or Area of Concern Source WI-13 E
SI-61 F
Tentative Disposition
6.(Cont) COMMENT: According to the PNWRBC, the problems caused by legal withdrawals of what are now recognized as excessive amounts of water, so far as instream uses are...
|
Source
F-5, 12 SI-33
PI-17, 21, 50, 60
Tentative Disposition
D
Problem or Area of Concern
3. The impact of water diversion for thermal plant cooling, whether for evaporation towers or for irrigation, should be checked. (G.B. 49)...
|
Source
W-6
SI-31, 42
WI-35
PI-18, 19, 20, 26, 34, 50
Tentative 1/ A
WI-72 F-16
F
0-4 F-16Disposition
A
Problem or Area of Concern
A. Possible Operational Improvement of Existing Projects
1. Determine criteria on daily and...
|
Tentative Disposition
A F F
F F
Problem or Area of Concern
4. Inundation of beaches, boat ramp, roads, and facilities will require replacement. Shoreline erosion and water level changes may require several maintenance considerations....
|